15
Non-combustible
wall finish zone
Max. 1-1/4” (32 mm)
thickness combustible
wall finish allowed
Combustible
framing material
1/2” (13 mm) non-combustible
cement board required.
(May be covered with max. 3/4”
(19 mm) combustible finish).
Combustible projections must
otherwise conform to allowable
mantel projections - see
Clearances to Combustible
Projections
section in this manual.
HeatShift plenum framing required (front or sides);
see instructions packed with HeatShift kit.
DO NOT use screws
in this zone!
Combustible wall finish
52” (1321 mm) max.
20” (508 mm) min.
44-1/2” (1
130 mm) min.
11-1/4”
(285 mm)
5-1/4”
(133 mm)
11”
(279 mm)
17”
(432 mm)
Combustible framing material
except
if using HeatShift front
outlet plenums LDK1 or LDK4:
in this case steel stud required
under outlet opening - see
instructions packed with
HeatShift kit
Zero
clearance
standoffs
WARNING
Ensure weight of wall above is
NOT carried by the appliance.
Framing—Minimal
Installation Planning