![Valor 1600KN Installation Manual Download Page 13](http://html.mh-extra.com/html/valor/1600kn/1600kn_installation-manual_851462013.webp)
13
Framing Dimensions
Installation Planning
Framing
NOTE
Use fo the optional HeatShift
System affects mantel and hearth
clearances. See HeatShift section in
Appendix D of this manual.
WARNING
HeatShift System MUST be installed
on this appliance when using
1530CIK—Clean Installation Kit!
Between underside
of header and bottom
of firebox
No hearth required.
If using a hearth,
see page 23.
1/2” thick non-combustible
cement board required above,
on each side and below
engine opening (NOT supplied)
- see page 36.
NOTE: Height of cavity may be affected
by vent configuration with clearance
- see page 26.
NOTE: This unit requires a
solid platform to support it.
Combustible framing allowed
beneath fireplace. When the
appliance is installed directly
on carpeting, tile or other
combustible material other
than wood flooring, the
appliance shall be installed
on a metal or wood panel
extending the full width
and recessed depth of the
appliance
43”
51-1/4”
*
18-1/2”
Critical!
This dimension is
total
framing cavity depth
not
including any wall finish.
page 11.
page 14.