Safety information
Follow the safety information and conditions from
Chapter 1 (see
The work described in the following requires proof of
the following qualifications:
See
It is strictly forbidden to work on high-voltage compo-
nents that are under voltage! MORTAL DANGER !!
8.2
Versions of ADA
NOTE:
Most of the work described below is identical for HP and
HP + systems. Wherever there are differences, this is
explicitly stated. The information of some graphics apply
for both versions. These graphics are marked as "exem-
plarily".
8.3
Preparation/follow-up
The use of a suitable and secure lifting device is required
when lifting heavy components.
Use only suitable and technically secure lifting
devices (>100kg).
Do not stand under suspended loads!
8.3.1 High-voltage system
The vehicle’s battery system must be separated by an
authorized (by the vehicle manufacturer) and trained
specialist of high-voltage systems (decommission-
ing). The rules provided by the vehicle manufacturer
must be followed precisely.
Before beginning any work on the high-voltage
system, always make sure there is no voltage present
at the power supply of the frequency converter, using
a voltage tester (CAT IV) suitable for HV systems (
Chap.
8.3.2 Refrigeration section
When working on the refrigerant circuit, the rules for eva-
cuating and filling the REVO-E apply. Replace the sealing
rings from the opened connections and oil them before
replacing (refrigerator oil). If opening the refrigerant circuit
is required, the following preparation and follow-up work
must be completed.
Preparation work
–
Vehicle / air-conditioning system powered off (primary
switch / battery disconnection switch)
–
If necessary, remove protective cover for the com-
pressor / frequency converter
–
Open the side covers of the air-conditioning system
and prop up with rods (attached to cover)
–
Remove the coil of the solenoid valve and replace with
permanent magnet
–
Siphon refrigerant via high and low pressure connec-
tions on the compressor
–
Close openings of components of the refrigerant
circuit with suitable plugs (presents water absorption
by the refrigerant oil)
Follow-up work
–
Exchange filter dryers
–
Evacuation the air-conditioning system
–
Check tightness
ATTENTION:
The maximum pressure is 17 bar, the suction pres-
sure sensor will become damaged otherwise!
–
Fill the air-conditioning system with R134a
–
Remove the permanent magnet from the magnet
valve and install the coil
–
Mount / close the cover
–
Test functionality
Torque table, see
Potential risk to health
and life!
Warning!
High voltage!
Caution
Mortal danger!
Warning!
Risk of injury from falling
components of the air-condi-
tioning system!
Warning!
Summary of Contents for REVO-E
Page 1: ...Rev 06 2019 Id No 11123006A REVO E Heat pump Volvo Workshop Manual AIR CONDITIONING...
Page 51: ...605 REVO E Heat pump 6 Wiring plan Fig 601 Wiring diagram for REVO E HP Sheet 4...
Page 52: ...606 REVO E Heat pump 6 Wiring plan Fig 601 Wiring diagram for REVO E HP Sheet 5...
Page 55: ...609 REVO E Heat pump 6 Wiring plan Fig 602 Wiring diagram for REVO E HP Sheet 1...
Page 56: ...610 REVO E Heat pump 6 Wiring plan Fig 602 Wiring diagram for REVO E HP Sheet 2...
Page 57: ...611 REVO E Heat pump 6 Wiring plan Fig 602 Wiring diagram for REVO E HP Sheet 3...
Page 59: ...613 REVO E Heat pump 6 Wiring plan Fig 602 Wiring diagram for REVO E HP Sheet 5...
Page 87: ...memos...