413
REVO-E Heat pump
4 Function and functional schematics
This mode is only available with the REVO-E HP + (addi-
tional solenoid valve) and allows the use of the system up
to an outside temperature of -5°C.
For component safety, the SC620 starts the De-Icing
Mode each time before starting the heat pump function.
Furthermore, the de-icing is activated after one hour Heat
Pump Mode and takes between 2 min and 15 min depen-
ding on the degree of icing of the outer heat exchanger.
In order to use the necessary energy for the fastest
possible de-icing, the double radial blowers are switched
off during this time.
The BEA body control is informed via CAN from the
SC620 about the mode and heats the passenger compart-
ment via the floor heating circuit.
4.4.7 Operating Mode Oil Recovering
(Version HP+ only)
Serves to protect the compressor.
After approx. 4 hours in heat pump mode, the ADA
switches to the oil return mode. The refrigeration oil
distributed in the ADA is thus returned to the compressor.
Summary of Contents for REVO-E
Page 1: ...Rev 06 2019 Id No 11123006A REVO E Heat pump Volvo Workshop Manual AIR CONDITIONING...
Page 51: ...605 REVO E Heat pump 6 Wiring plan Fig 601 Wiring diagram for REVO E HP Sheet 4...
Page 52: ...606 REVO E Heat pump 6 Wiring plan Fig 601 Wiring diagram for REVO E HP Sheet 5...
Page 55: ...609 REVO E Heat pump 6 Wiring plan Fig 602 Wiring diagram for REVO E HP Sheet 1...
Page 56: ...610 REVO E Heat pump 6 Wiring plan Fig 602 Wiring diagram for REVO E HP Sheet 2...
Page 57: ...611 REVO E Heat pump 6 Wiring plan Fig 602 Wiring diagram for REVO E HP Sheet 3...
Page 59: ...613 REVO E Heat pump 6 Wiring plan Fig 602 Wiring diagram for REVO E HP Sheet 5...
Page 87: ...memos...