Page 57
Installation Instructions and Owner’s Manual - L48
ENGLISH
CAUTION
Do not place crushed glass
around the pilot assembly.
Crushed glass must be placed on
the burner screen in a single layer.
Additional crushed glass may be
placed on the barrier cover areas
away from the barrier screen.
NOTE: Once the installation is complete with the
logs, rocks, and crushed glass media in place,
operate the fireplace to verify flame appearance.
If there are flames directly impinging a log, turn off
fireplace, then remove the crushed glass media
directly below where the flame impingement
occurred. This should eliminate sooting on the log,
and provide a more pleasing flame appearance.
Proper Log Set Operation
Properly installed and properly maintained log sets
do not deposit soot on the logs. If users see soot
appear on a log, call for service. Do not continue
to operate the fireplace.
Installation of the Pins for Log and Rock
Placement
The log and rock hardware kit includes eight 8-32
x 3/4” long self-threading screws, and eight 9/16”
long spacers. Install the screws and spacers prior
to the log and rock placement.
Note: It is highly recommended that the fireplace
liner be installed prior to installing the log and
rock spacers so interference with the locator pins
is avoided.
Use a power drill with a phillips drive to install the
screws through a spacer at each of the eight pilot
hole locations provided in the burner cover. These
will be the locator pins for the logs and rocks.
Note: If the fireplace includes the variable halogen
lighting glass panels, please remove the glass
panels prior to installing the logs and rock screws
and spacers. Replace the glass panels after the
spacers are installed.
Rocks Identification
TOP VIEW
FRONT VIEW
DESCRIPTION
& PART
NUMBER
Rock A
Rock B
Rock E
Rock F
Rock G
Rock H
Rock I
Rock J