30
EN
Using the appliance
B
Programme sequence
The current programme sequence can be monitored by means of the programme monitoring
indicator. The corresponding light comes on at the start of each programme stage.
NOTE :
• If the “Anti-” secondary function has been
selected, the “End” and “Anti-” LEDs will light up
at the same time as the stage continues.
• Simply press a button or turn the programme selector
to end the programme whilst the “Anti-” stage is
running.
You can alter the secondary functions and the speed and temperature adjustments without
interrupting the programme sequence whilst the latter is running. In order to do so, make
sure that the change that you are about to make takes place after the current programme
stage. If the change is not suitable, the corresponding lights will flash 3 times.
NOTE : If the machine does not go to the spinning stage,
this may be because the Rinse Hold function is activated
or the automatic unbalanced load detection system is
activated due to the uneven distribution of laundry in the
machine.
Locking the loading door
• A locking system has been provided on the loading door of the machine to prevent the loading
door from opening when the water level is not appropriate.
• The loading door indicator starts to flash when the machine is paused. The machine checks the
water level inside. If the water level is appropriate, the loading door indicator will turn off and the
loading door can only be opened after 1 to 2 minutes.
• If, however, the water level is not appropriate, the loading door indicator will remain on to show
that the loading door cannot be opened. If you have to open the loading door when its light is on,
you must cancel the current programme. See “Cancelling the programme”.
Opening the loading door in case of a power failure: