1. Attach the welding joint to the process pipe or chamber.
2. Apply a sealant (MEGA-PIPE EXTRA No. 7188 or LOCTITE
â
No. 542 with activator No.
7649) on the threads of the welding joint and screw the bottom of the ball valve onto the
welding joint.
3. Tighten the ball valve assembly by turning from the ball valve body.
Tightening the ball valve kit by turning the extension nipple
can break the sealing. Tighten the ball valve assembly only from the ball
valve body.
CAUTION!
4. If you need to cap the ball valve assembly before installing or after removing the probe,
attach a blanking nut to close the top of the valve.
4.9 HMP9 probe
112 [4.41]
Probe cable 2 m [6.56 ft]
Ø 25 [0.98]
M12/5
94 [3.70]
Ø 2.4 [0.094]
Ø 5 ±0.05
[0.20 ±0.002]
16 [0.63]
Attachment point
mm
[in]
Figure 13 HMP9 probe dimensions
Vaisala HUMICAP
â
Humidity and Temperature Probe HMP9 is designed for easy installation
into rapidly changing environments where fast response time, measurement performance, and
chemical tolerance are essential.
Chapter 4 – Installation
31
Summary of Contents for HMP Series
Page 10: ...HMP Series with MMP8 and TMP1 User Guide M212022EN F 8...
Page 116: ......
Page 117: ......
Page 118: ...www vaisala com...