64
20901101_EN_PC5xx-6xx_select_Serie_V1.3_260819
Cleaning and maintenance
7.3 Vacuum pump maintenance
7.3.1 Maintenance items
Items that require maintenance
1
2
1
2
A
B
Maintenance items
1
Pump heads, power connection side
2
Pump heads, vapor condenser side (EK)
>
Perform maintenance of the pump heads one after the other
>
In the case of the pump heads, always change the dia
-
phragms and valves completely, as shown in the image
description for pump head
(1A)
.
Straightforward maintenance due to split work steps.
>
>
On one pump head pair, first replace the diaphragms.
>
>
Then change the inlet/outlet valves.
>
>
Repeat these steps on the next pump head pair.
Example
Maintenance of the
pump heads
A = 4‑headed
B = 2‑headed
IMPORTANT!
Summary of Contents for PC 510 select
Page 12: ...12 20901101_EN_PC5xx 6xx_select_Serie_V1 3_260819 Introduction ...
Page 44: ...44 20901101_EN_PC5xx 6xx_select_Serie_V1 3_260819 Installation and connection ...
Page 90: ...90 20901101_EN_PC5xx 6xx_select_Serie_V1 3_260819 ...
Page 91: ...91 20901101_EN_PC5xx 6xx_select_Serie_V1 3_260819 ...