![vacuubrand MD 12C NT VARIO o.C. Instructions For Use Manual Download Page 55](http://html1.mh-extra.com/html/vacuubrand/md-12c-nt-vario-o-c/md-12c-nt-vario-o-c_instructions-for-use-manual_3201363055.webp)
55
20901544_E12C+16C_NT Vsel_V1.2_260922
Cleaning and maintenance
7.3
7.3 Diaphragm pump maintenance
Diaphragm pump maintenance
7.3.1
7.3.1 Maintenance items
Maintenance items
Items that require maintenance
5
4
1
2
3
Maintenance items and sequence
1
Suction/pressure distributor
2
Right pump head pair
3
Bottom pump head pair
4
Left pump head pair
5
Top pump head pair
Straightforward maintenance due to split work steps.
Observe the recommended sequence of maintenance steps
according to the table:
>
Replace the O‑ring and pressure relief valve in the suction/
pressure distributor.
>
Next, on one pump head pair, first replace the diaphragms.
>
Then change the inlet/outlet valves.
>
Repeat these steps on the next pump head pair.
Example
Diaphragm
pump, front,
semi‑transparent
view
Meaning