© 2018 Utilicor Technologies Inc.
minicor-3 V1.5
1
Contents
Safety Instructions
2
Equipment Safety Guidelines
3
Preparation
5
Operational Safety
7
Transport Safety
10
Maintenance Safety
11
Storage Safety
13
Safety Warning Labels
14
Introduction
15
Suggested Operator Qualification and Training
17
Pre-Trip Procedure
18
Pre-Departure Checklist
19
Utilicor Process Pilot Bit and Integral Center Pilot Hole
20
Tips for a Successful Coring Operation
21
Step 1: Operating the minicor-3
23
Step 2: Coring Process
24
Step 3: Site Clean Up
29
Step 4: Detach Minicor-3
30
Tips for Successful Core Reinstatement
31
Winterizing
33
minicor-3
™
Equipment Maintenance
34
Drill Carriage Schematic
36
Core Drum Assembly
37
Pillow Block Assembly
38
Drylin Rails and Cars
39
Troubleshooting
40
minicor-3
™
Hydraulic Schematic
41
minicor-3
™
Electrical Schematic
42
Warranty (Please complete Warranty card)
43