9
This boiler has been equipped for residential installations.
If used for commercial applications, any additional code
requirements must be adhered to for installation. This may
require additional controls including but not limited to a
low water cut off, a manual reset high temperature limit, and
wiring and/or piping modifications. The manufacturer is
not responsible for any field installation changes made to a
boiler installation which are not described or acknowledged
in this manual.
Complete all of the following prior to installing the boiler.
A. Codes
This boiler product is a gas-fired, direct vent, condensing boiler
and must be installed in accordance with all applicable federal,
state and local building codes including, but not limited to the
following:
United States
- Installation shall conform with National Fuel
Gas Code (NFPA-54/ANSI Z223.1-latest edition)
Canada
- Installation shall be in accordance with CSA B 149.1
and .2. installation codes.
Where required by the authority having jurisdiction, the instal-
lation must conform to the American Society of Mechanical
Engineers Safety Code for Controls and Safety Devices for
Automatically Fired Boilers, No.CSD-1.
RULES FOR SAFE INSTALLATION AND OPERATION
BEFORE INSTALLING THE BOILER
WARNING
!
Important - In the state of Massachusetts this product
must be installed by a licensed plumber or gas fitter and the
installation must be in accordance with 248 CMR.
The installation must conform to the requirements of the author-
ity having jurisdiction or, in the absence of such requirements, to
the National Fuel Gas Code, ANSI Z223.1 - latest revision.
Installers
- Follow local regulations with respect to installation
of CO (Carbon Monoxide) Detectors. Follow maintenance
recommendations in this manual.
Installation Requirements Specific To The State Of
Massachusetts For Direct Vent, Mechanical Vent, And
Domestic Hot Water Appliances
For all side wall horizontally vented gas fueled equipment
installed in every dwelling, building or structure used in
whole or in part for residential purposes, including those
owned or operated by the commonwealth and where the
side wall exhaust vent termination is less than seven (7)
Read the entire installation manual before beginning the
1.
installation. Failure to follow these rules for safe instal-
lation and operation and these instructions could cause
a malfunction of the boiler and result in death, serious
bodily injury, and/or property damage.
Check all applicable state and local building codes and
2.
utility company requirements before installation. The
installation must conform with these requirements in their
entirety. In the absence of these codes, use NFPA Installa-
tion Codes and good industry practice.
Before servicing the boiler - allow the boiler to cool. Al-
3.
ways shut off any electricity and gas supply connected to
the boiler prior to servicing.
Inspect gas line for leaks.
4.
Be certain gas input rate is correct. Over firing may result
5.
in early failure of the boiler sections. This may cause
dangerous operation. Under firing may result in too much
air for the pre-mix burner causing poor or loss of combus-
tion.
Never vent the products of combustion from this boiler
6.
to an enclosed space. Always vent to the outdoors. Never
vent to another room or to inside a building.
Be sure there is adequate outdoor air supply to boiler for
7.
complete combustion.
Follow a regular service and maintenance schedule for ef-
8.
ficient and safe operation.
Keep boiler area clean of debris and free of combustible
9.
and flammable materials.
Proper through the wall or through the roof combustion
10.
venting shall be in accordance with the materials and
methods described in this manual. Installation must com-
ply with local codes.
This boiler and related hot water heating systems are not
11.
do it yourself items. They must be installed and serviced by
qualified professionals.
Summary of Contents for UB100
Page 15: ...15 Near Boiler Piping Figure 2 Single Zone Boiler Piping ...
Page 16: ...16 Figure 3 Multi zone Boiler Piping With Zone Valves Near Boiler Piping ...
Page 19: ...19 Figure 6 Diaphragm Type Expansion Tank Piping Near Boiler Piping ...
Page 20: ...20 Figure 7 Conventional closed type Expansion Tank Piping Near Boiler Piping ...
Page 27: ...27 Combustion Air and Vent Pipe Figure 11 Combustion Air and Vent Piping ...
Page 32: ...32 Electrical Wiring Figure 13 Field Wiring Connections ...
Page 53: ...53 DETAILED SEQUENCE OF OPERATION ...
Page 57: ...57 TROUBLESHOOTING CHART 2 TROUBLESHOOTING ...
Page 58: ...58 TROUBLESHOOTING CHART 3 TROUBLESHOOTING ...