18
B. Pressure Relief Valve
The boiler is furnished with a factory installed relief valve in
the top of the boiler. Provide ¾” piping from the supplied
relief valve to a local floor drain, but leave an air gap between
piping and drain. No shutoff of any description shall be placed
between safety relief valve and the boiler, or on the discharge
pipes between such safety valve and the atmosphere. Instal-
lation of the safety relief valve shall conform to ANSI/ASME
Boiler and Pressure Vessel Code, Section IV. The manufacturer
is not responsible for any water damage.
C. Expansion Tank And Make-Up Water
Determine required system fill pressure, system design tem-
perature, and system water content. Boiler contains 2.6 gallons
(U.S.). Size expansion tank accordingly. Consult expansion
tank manufacturer for proper sizing information. Connect
properly sized expansion tank (not furnished) as shown in
Figure #6 for diaphragm type expansion tank and
Figure #7
for conventional closed type expansion tanks. For diaphragm
type expansion tanks, adjust the tank air pressure to match the
system fill pressure. Install air vent (furnished) as shown for
diaphragm type expansion tank system only. Install make-
up water connections as shown per local codes. If a pressure
reducing valve is used, adjust to match the system fill pressure.
In connecting the cold make-up water supply to the boiler,
make sure that clean water supply is available. When the water
supply is from a well or pump, sand strainer should be installed
at the pump.
Figure 5 - Single Zone Boiler Piping
NEAR BOILER PIPING
Summary of Contents for UB100
Page 15: ...15 Near Boiler Piping Figure 2 Single Zone Boiler Piping ...
Page 16: ...16 Figure 3 Multi zone Boiler Piping With Zone Valves Near Boiler Piping ...
Page 19: ...19 Figure 6 Diaphragm Type Expansion Tank Piping Near Boiler Piping ...
Page 20: ...20 Figure 7 Conventional closed type Expansion Tank Piping Near Boiler Piping ...
Page 27: ...27 Combustion Air and Vent Pipe Figure 11 Combustion Air and Vent Piping ...
Page 32: ...32 Electrical Wiring Figure 13 Field Wiring Connections ...
Page 53: ...53 DETAILED SEQUENCE OF OPERATION ...
Page 57: ...57 TROUBLESHOOTING CHART 2 TROUBLESHOOTING ...
Page 58: ...58 TROUBLESHOOTING CHART 3 TROUBLESHOOTING ...