66
8
Connect to the drain port at
the bottom of boiler
Connect to the
drain port at
the exhauster
3
1
2
2
4
5
6
7
1
KEY #
DESCRIPTION
QUANTITY
ITEM NUMBER
1
59019 ½”IDx1/8” THk VINYL TUBING
AS REqUIRED
14631035
2
57134 ¾” SNAP GRIP CLAMP
6
14631141
3
62067 ½”ID HOSE TEE
1
14631320
4
62017 ½”NPTx ½”ID TUBE STRAIGHT
1
14631101
5
½” PVC COUPLING, SCH 80
1
14631306
6
½”´4” PVC NIPPLE, SCH 80
1
14631322
7
TEE PVC ½”SLIP x ½”SLIP x ½”NPT FEMALE
1
14631020
8
S. S. CLAMP, SIzE 16 (13/16”~1 ½”)
1
14631323
B. Condensate Drain Trap Assembly
REPAIR PARTS
Summary of Contents for UB100
Page 15: ...15 Near Boiler Piping Figure 2 Single Zone Boiler Piping ...
Page 16: ...16 Figure 3 Multi zone Boiler Piping With Zone Valves Near Boiler Piping ...
Page 19: ...19 Figure 6 Diaphragm Type Expansion Tank Piping Near Boiler Piping ...
Page 20: ...20 Figure 7 Conventional closed type Expansion Tank Piping Near Boiler Piping ...
Page 27: ...27 Combustion Air and Vent Pipe Figure 11 Combustion Air and Vent Piping ...
Page 32: ...32 Electrical Wiring Figure 13 Field Wiring Connections ...
Page 53: ...53 DETAILED SEQUENCE OF OPERATION ...
Page 57: ...57 TROUBLESHOOTING CHART 2 TROUBLESHOOTING ...
Page 58: ...58 TROUBLESHOOTING CHART 3 TROUBLESHOOTING ...