2GN/2GP/2GR
1-5-27
1-5-6 Transfer section
(1) Detaching and refitting the transfer roller unit
Follow the procedure below to replace the transfer roller unit.
Procedure
1. Open the left cover 1.
2. While holding down the projection, slide the
transfer roller unit toward the front to remove
it.
3. Replace the transfer roller unit and install
the unit.
Figure 1-5-56
Transfer roller unit
Projection
Summary of Contents for CD 1230
Page 1: ...Service Manual Copy CD 1230 CD 1240 CD 1250 Version 1 0 Date 04 07 2006 2GNSM060 ...
Page 2: ...Service Manual Copy DC 2230 DC 2240 DC 2250 Version 1 0 Date 04 07 2006 2GNSM060 ...
Page 4: ...Revision history Revision Date Replaced pages Remarks ...
Page 5: ...This page is intentionally left blank ...
Page 113: ...2GN 2GP 2GR 1 3 82 ...
Page 231: ...2GN 2GP 2GR 2 2 6 ...
Page 253: ...INSTALLATION GUIDE FOR THE DOCUMENT PROCESSOR ...
Page 275: ...INSTALLATION GUIDE FOR BUILT IN FINISHER ...
Page 288: ...INSTALLATION GUIDE FOR JOB SEPARATOR ...
Page 297: ...INSTALLATION GUIDE FOR FAX System M ...