The following steps illustrate how to calibrate pump #2 on an LP series seed treater.
A stop watch and measuring cup will be needed in the calibration process.
1.
Lock down the pump tubing in the Pump #2 pump head. (page 22)
2.
Premix enough liquid for the amount of seed you are treating and pour into the
5 gallon poly tank. It’s always a good practice to mix up 20% extra slurry to help
fill all the lines.
3.
Turn the INOCULANT valve to the CALIBRATE position, and the Calibration Valve
to RECIRCULATE.
4.
Turn the pump #2 direction switch to FORWARD.
5.
Turn the HAND / OFF / AUTO switch to the Hand position and set
the Pump #2 liquid adjustment dial (right) to about 500 or half
speed. Liquid should begin circulating from the bottom of the mix
tank, through the pump, and back into the top of the tank.
6.
Allow pump to re
-
circulate liquid for approximately 15 minutes to
ensure all air has been removed from the liquid lines. This will also
help break
-
in the pump tubing, which is critical before checking
pump calibration.
7.
After you have allowed the liquid to circulate you are ready to calibrate the liquid
flow. Determine the number of ounces needed in one minute.
EXAMPLE:
The seed treatment slurry rate is 5 ounces per cwt.
Seed Flow Rate = 6.41 cwt/min. x 5 oz./cwt. = 32.1 oz./min.
32.1 oz. is the rate the pump should be pumping in one minute.
8. Set the Liquid Adjustment Dial . You can use the chart on page 34 to find a starting
point.
EXAMPLE:
The ounces needed in one minute = 32.1 oz/min. Assume we are
using a 6
-
600 Masterflex pump. A good starting point is approximately
39.4 volts.
9.
Using the stop watch and measuring cup, determine the pump flow rate. Hold the
measuring cup under the calibration hose next to the Side Valve.
10.
Keeping the pump running, position the Calibration Valve to CALIBRATE.
When liquid begin timing for one minute as soon as liquid begins flowing into the
measuring cup.
PUMP #2 CALIBRATION
Summary of Contents for LPH800
Page 17: ...Page 17 LPH800 TREATER LPH800 MIX TANK PLUMBING 2 3 ...
Page 49: ...Page 49 LPH800 TREATER LPH800 BASE FRAME ASSEMBLY 18 01 0011 2 9 1 19 16 10 17 15 ...
Page 50: ...Page 50 LPH800 TREATER LPH800 BASE FRAME ASSEMBLY 18 01 0011 20 5 2 3 18 12 3 18 13 2 21 2 ...
Page 57: ...Page 57 LPH800 TREATER LPH800 TREATER Drum 41 A DETAIL A 19 4 42 26 ...
Page 60: ...Page 60 LPH800 TREATER LPH800 TREATER Discharge End 44 49 42 52 46 28 23 ...
Page 61: ...Page 61 LPH800 TREATER LPH800 TREATER Forklift Pockets and Bottom Guards 22 15 16 51 22 26 ...
Page 68: ...Page 68 LPH800 TREATER 30 GALLON TANK AND BASE ASSEMBLY 04 03 0199 7 6 5 2 3 8 10 4 1 4 9 ...
Page 70: ...Page 70 LPH800 TREATER LPH CALIBRATION TUBE ASSEMBLY 13 04 0208 4 10 1 3 8 6 7 11 5 2 9 9 ...
Page 74: ...Page 74 LPH800 TREATER NOTES ...