
Page 15
LPH800 TREATER
13.
Have a certified electrician provide power to the
seed treating system. Provide convenient shutdown
switches, comply with local electrical codes and ensure
that the system is properly grounded and bonded.
The USC system must be connected to the same
electrical requirements as specified in the main control
panel on the power requirement tag (right), or the
electrical schematic shipped with the piece of
equipment. This will power the USC system
including conveyors.
Control panel bracket is hinged to allow
access to the atomizer chamber.
Flexible conduit is recommended for
main power supply.
14.
Reverse the previous steps when
removing the machine from its
working position.
Incoming Power Connected To
These Terminals
12.
Connect any conveyors into the seed treater control
panel. Ensure that the conveyors being used are
the same power ratings as the seed treater.
TREATER SET
-
UP
The starters and overloads located
in the seed treater panel are rated
for 5 HP motors. Do
NOT
plug any
conveyor into the seed treater that
exceeds 5 HP.
NOTICE
NOTICE
Summary of Contents for LPH800
Page 17: ...Page 17 LPH800 TREATER LPH800 MIX TANK PLUMBING 2 3 ...
Page 49: ...Page 49 LPH800 TREATER LPH800 BASE FRAME ASSEMBLY 18 01 0011 2 9 1 19 16 10 17 15 ...
Page 50: ...Page 50 LPH800 TREATER LPH800 BASE FRAME ASSEMBLY 18 01 0011 20 5 2 3 18 12 3 18 13 2 21 2 ...
Page 57: ...Page 57 LPH800 TREATER LPH800 TREATER Drum 41 A DETAIL A 19 4 42 26 ...
Page 60: ...Page 60 LPH800 TREATER LPH800 TREATER Discharge End 44 49 42 52 46 28 23 ...
Page 61: ...Page 61 LPH800 TREATER LPH800 TREATER Forklift Pockets and Bottom Guards 22 15 16 51 22 26 ...
Page 68: ...Page 68 LPH800 TREATER 30 GALLON TANK AND BASE ASSEMBLY 04 03 0199 7 6 5 2 3 8 10 4 1 4 9 ...
Page 70: ...Page 70 LPH800 TREATER LPH CALIBRATION TUBE ASSEMBLY 13 04 0208 4 10 1 3 8 6 7 11 5 2 9 9 ...
Page 74: ...Page 74 LPH800 TREATER NOTES ...