Page 33
LPH800 TREATER
9.
Using the stop watch, determine the pump flow rate. Keeping the pump running,
position the valve on top of mix tank to CALIBRATION TUBE. When liquid reaches
0 (zero) or an even number, begin timing for one minute. (see Figure 1, below)
10. As soon as one minute is up, position valve on top of mix tank to MIX TANK.
Read the level on the side of the calibration tube (see Figure 2, below). This
number should equal the number of ounces needed to flow through the pump in
one minute. If the ounces needed per minute have not been met, re
-
adjust the
pump speed up or down accordingly and repeat steps 9 and 10 until the liquid flow
rate has been matched.
Figure 1
Liquid at 0 oz.
Figure 2
Liquid at 35 oz.
after 1 minute
PUMP #1 CALIBRATION
Summary of Contents for LPH800
Page 17: ...Page 17 LPH800 TREATER LPH800 MIX TANK PLUMBING 2 3 ...
Page 49: ...Page 49 LPH800 TREATER LPH800 BASE FRAME ASSEMBLY 18 01 0011 2 9 1 19 16 10 17 15 ...
Page 50: ...Page 50 LPH800 TREATER LPH800 BASE FRAME ASSEMBLY 18 01 0011 20 5 2 3 18 12 3 18 13 2 21 2 ...
Page 57: ...Page 57 LPH800 TREATER LPH800 TREATER Drum 41 A DETAIL A 19 4 42 26 ...
Page 60: ...Page 60 LPH800 TREATER LPH800 TREATER Discharge End 44 49 42 52 46 28 23 ...
Page 61: ...Page 61 LPH800 TREATER LPH800 TREATER Forklift Pockets and Bottom Guards 22 15 16 51 22 26 ...
Page 68: ...Page 68 LPH800 TREATER 30 GALLON TANK AND BASE ASSEMBLY 04 03 0199 7 6 5 2 3 8 10 4 1 4 9 ...
Page 70: ...Page 70 LPH800 TREATER LPH CALIBRATION TUBE ASSEMBLY 13 04 0208 4 10 1 3 8 6 7 11 5 2 9 9 ...
Page 74: ...Page 74 LPH800 TREATER NOTES ...