Install and tighten all connectors. The roof connector nuts require an 11/32” open end wrench to access
the studs at the peak.
Install the completed H-Body on the pump house studs. Align the “Controller Side” labels on the pump
box and H-body on the same side.
3.4.2
Controller & Module C Installation
Hang the Controller on the side labeled “Controller Side”. Install feet first into the precut holes. Loosen
the S.S. cap screw to allow the Controller carrying handle to clear the cap screw and slide into the
receiver. Hand tighten the cap screw so the Controller is captive.
Repeat the process for the Sampler Module as shown at right.
Install the six (6) S.S. acorn nuts and washers on the H-body base studs. Use the supplied Loctite on the
studs at this time, then tighten all nuts.
22