3-4
AB62 Work Platform - European
M
AINTENANCE
Section
3.3
Preventative Maintenance Table Key
Interval
Daily=each shift or every day
50h/30d=every 50 hours or 30 days
250h/6m=every 250 hours or 6 months
1000h/2y=every 1000 hours or 2 years
Y=Yes/Acceptable
N=No/Not Acceptable
R=Repaired/Acceptable
Preventative Maintenance Report
Date: ___________________________________
Owner: _________________________________
Model No: _______________________________
Serial No: _______________________________
Serviced By: _____________________________
Service Interval: __________________________
Table 3-1: Preventative Maintenance Check List
COMPONENT
INSPECTION OR SERVICES
INTERVAL
Y
N
R
Battery
Check electrolyte level
Daily
Clean exterior
3m
Clean terminals
3m
Engine Oil and
Filter
Check level and condition
Daily
Check for leaks
Daily
Change oil & filter (Diesel)
500h
Change oil & filter (Gas)
200h
Engine Fuel
System
Check fuel level
Daily
Check for leaks
Daily
Replace fuel filter
6m
Check air cleaner
Daily
Engine
Coolant
Check coolant level (with engine cold)
Daily
Replace coolant
3m
Hydraulic Oil
*See Note
Check oil level
Daily
Change filter
6m
Drain and replace with ISO 46 compatible
2y
Hydraulic
System
Check for leaks
Daily
Check hose connections
30d
Check hoses for exterior wear
30d
Emergency
Hydraulic
System
Operate the emergency lowering valve and
check for serviceability
Daily
Controller
Check operation of all controls
Daily
Control Cable
Check the exterior of the cable for
pinching, binding or wear
Daily
Platform Floor
and Rails
Check fasteners for proper torque
Daily
Check welds for cracks
Daily
Check condition of platform
Daily
Check condition of anchorage points
Daily
Check condition of operator manual
Daily
Tires
Check for damage
Daily
Check lug nuts
(torque to 190 ft. lbs.[257Nm])
30d
Check air pressure (80 psi [5.5 bar])
Daily
Hydraulic
Pump
Wipe clean
30d
Check for leaks at mating surfaces
30d
Check for hose fitting leaks
Daily
Check mounting bolts for proper torque
30d
Hydraulic
Drive System
Check hydraulic drive motor operation
Daily
Check hoses,fittings, and valve block for
leaks
Daily
Torque Hubs
Check for leaks
Daily
Check oil level
250h/6m
Change Oil after break-in period
50h/30d
Change Oil (SAE 90 wt. gear oil)
2000h/2y
Steering
System
Check hardware & fittings for proper torque
6m
Check linkage for wear areas
30d
Oil all pivot points
30d
Check steering cylinder for leaks
30d
Check for missing/loose retainers
Daily
Elevating
Assembly
Inspect for structural cracks
Daily
Check pivot points for wear
30d
Check pivot pin retaining bolts for proper
torque
30d
Check members for deformation
Daily
Chassis
Check hoses for pinch or rubbing points
Daily
Check component mounting for proper
torque
6m
Check welds for cracks
Daily
Lift Cylinder
Check the cylinder rod for wear
30d
Check pivot pin retaining bolts for proper
torque
30d
Check seals for leaks
30d
Inspect pivot points for wear
30d
Check fittings for proper torque
30d
Turret
Check ring gear for proper
lubrication and wear
Daily
Lubricate ring gear (MoS
2
grease)
150h/3m
Entire Unit
Check for and repair collision damage
Daily
Check fasteners for proper torque
3m
Check for corrosion-remove and repaint
6m
Lubricate
30d
Labels
Check for peeling, missing, or unreadable
labels & replace
Daily
COMPONENT
INSPECTION OR SERVICES
INTERVAL
Y
N
R
*ISO grade 46, for temperatures above 32° F (0° C).
*For colder climates: ISO grade 32, for temperature range of 0° F (-17° C) up to 32° F (0° C).
*ISO grade 15, for temperatures below 0° F (-17° C).
Summary of Contents for ab62
Page 1: ......
Page 4: ...ii AB62 Work Platform European FOREWORD NOTES ...
Page 42: ...3 24 AB62 Work Platform European MAINTENANCE Section 3 13 NOTES ...
Page 56: ...4 14 AB62 Work Platform European TROUBLESHOOTING Section 4 4 Notes ...
Page 61: ...AB62 Work Platform European 5 5 SCHEMATICS Section 5 1 Notes ...
Page 75: ...Page 6 5 Illustrated Parts Breakdown AB62 Work Platform European NOTES ...
Page 77: ...Page 6 7 Illustrated Parts Breakdown Basic Assembly AB62 Diesel AB62 Work Platform European ...
Page 79: ...Page 6 9 Illustrated Parts Breakdown Chassis Assembly AB62 Work Platform European ...
Page 81: ...Page 6 11 Illustrated Parts Breakdown Front Axle Assembly AB62 Work Platform European ...
Page 83: ...Page 6 13 Illustrated Parts Breakdown Elevating Assembly AB62 Work Platform European ...
Page 85: ...Page 6 15 Illustrated Parts Breakdown Linkage Assembly AB62 Work Platform European ...
Page 87: ...Page 6 17 Illustrated Parts Breakdown Straight Boom Assembly AB62 Work Platform European ...
Page 89: ...Page 6 19 Illustrated Parts Breakdown AB62 Work Platform European NOTES ...
Page 91: ...Page 6 21 Illustrated Parts Breakdown Turret Assembly AB62 Work Platform European ...
Page 95: ...Page 6 25 Illustrated Parts Breakdown AB62 Work Platform European NOTES ...
Page 97: ...Page 6 27 Illustrated Parts Breakdown Cover Assembly AB62 Work Platform European ...
Page 103: ...Page 6 33 Illustrated Parts Breakdown AB62 Work Platform European NOTES ...
Page 111: ...Page 6 41 Illustrated Parts Breakdown Control Module Assembly AB62 Work Platform European ...
Page 139: ...Page 6 69 Illustrated Parts Breakdown Label Kit AB62 Diesel AB62 Work Platform European ...
Page 144: ...Page 6 74 Illustrated Parts Breakdown AB62 Work Platform European NOTES ...
Page 145: ......