background image

 

-23- 

ITEM 

PART NO. 

DESCRIPTION 

ITEM 

PART NO. 

DESCRIPTION 

69465B 

Main Weldment 

23 

40488 

Auger Housing 

69461 

Impingment Plate Weldment 

24 

40489 

Auger, Short 

69462 

Ash Dump Weldment 

25 

40490 

Auger, Long 

25361 

Guide, Ash Dump Rod 

26 

88101 

Gasket, Mounted Bearing 

89954 

Spring Handle 

27 

891105 

Mounted Bearing 

69466 

Hopper Weldment 

28 

25370 

Stop, Auger Motor 

88110 

Gasket, Hopper Bottom 

29 

891117 

Shaft Collar, 3/4" ID 

69463B 

Ash Pan Weldment 

30 

83045 

Washer 

89899 

Knob 

31 

83337 

5/16-18 x 1-1/4 Bolt 

10 891122  Burnpot 

Weldment 

32  80474 

Auger 

Motor 

11 

88102 

Gasket, Burnpot 

33 

86613 

Air Intake Tube 

12 25355  Burn 

Plate 

34  80481 

Ignitor 

Cartridge 

13 

83475 

5/16-18 x 1-3/4 Bolt 

35 

80472 

Blower, Distribution 

14 

25080B 

Latch, Door 

36 

88106 

Gasket, Distribution Blower 

15 

69467 

Feed Door Assembly 

37 

88107 

Insulation, Exhaust Chute 

15.1 40424 

Feed 

Door 

38 

80473 

Blower, 

Exhaust 

15.2 

891067 

Door Glass w/Ashley Logo 

39 

88100 

Gasket, Exhaust Blower 

15.3 

88087 

Glass Gasket (1 x 3/16) 

40 

25377 

Blower Access Cover 

15.4 25393 

Glass 

Retainer 

41 

80478 

Pressure 

Switch 

15.5 

88066 

5/8 Rope Gasket 

42 

891121 

Silicone Tube 

15.6 

40437 

Handle, Door 

43 

89586 

Auger Nipple 

15.7 

83506 

3/8 x 1-1/4 Roll Pin 

44 

25344B 

Back, Cabinet 

15.8 

89574 

Handle, Brass Spring 

45 

80462 

Recepticle, 3 Prong 

16 

69464B 

Cabinet Top-Front Weldment 

46 

80461 

Power Supply Cord 

17 69471B  Cabinet 

Top-Lid 

Weldment 

 

 

 

18 88109  Seal, 

Hopper 

Lid 

 

 

 

19 891125  Latch, 

Hopper 

Lid 

 

 

 

20 

80475 

Circuit Board Assembly 

 

 

 

21 80480  Temperature 

Sensor 

 

 

 

22 

83524 

5/16-18 x 1 Flat Head Socket Cap Screw 

 

 

 

REPAIR PARTS LIST—MODEL 5700 

HOW TO ORDER REPAIR PARTS 

When inquiring about spare parts, always give the full model number which is on the nameplate attached to the 
back of the unit. 
The following information is needed when ordering spare parts: 

 
 
 

 
 

United States Stove Company 

227 Industrial Park Road 

PO Box 151 

South Pittsburg, TN 37380 

(888) 299-1440 (Parts Department) 

www.usstove.com 

1)  Part Number: 

 

2)  Part Description: 

 

3)  Model Number: 

5700 

4)  Serial Number: 

 

Summary of Contents for Ashley Heritage 5700

Page 1: ...ASSISTANCE PHONE 800 750 2723 FAX 423 837 2109 Please read this entire manual before installation and use of this appliance Failure to follow these instructions could result in property damage bodily...

Page 2: ...on 10 Through the Roof Ceiling Installation 10 Outside Air Supply 11 Special Mobile Home Requirements 12 OPERATION 13 How Your Stove Works 13 Control Panel 14 Unit Preparation 14 Performing a Dry Run...

Page 3: ...tain your stove may lead to improper and or unsafe operation Disconnect the power cord before performing any maintenance NOTE Turning the ON OFF Switch to OFF does not disconnect all power to the elec...

Page 4: ...e items on or near this stove When installed in a mobile home the stove must be grounded directly to the steel chassis and bolted to the floor WARNING THIS UNIT MUST NOT BE INSTALLED IN THE BED ROOM p...

Page 5: ...bic ft 1 4 to 5 16 diameter length no greater than 1 5 not less than 8 200 BTU lb moisture under 8 by weight ash under 1 by weight and salt un der 300 parts per million Pellets that are soft contain e...

Page 6: ...ended that only a authorized technician install your Ashley Heritage stove preferably an NFI certified specialist FLOOR PROTECTION This unit must be installed on a non combustible floor surface If a f...

Page 7: ...e Model 5700 stove may need to be greater than the minimum required clearance for suitable access to the control panel A BACKWALL TO UNIT 3 IN 75 MM B SIDEWALL TO FLUE 12 IN 305 MM C SIDEWALL TO TOP E...

Page 8: ...e or galvanized pipe with this unit The pellet vent pipe is designed to disassemble for cleaning and should be checked several times during the burning season Pellet vent pipe is not furnished with th...

Page 9: ...rade when adjacent to public walkways E Minimum 2 foot clearance above any grass plants or other combustible materials F Minimum 3 foot clearance from an forced air intake of any appliance G Minimum 2...

Page 10: ...used if your stove is below ground level by simply adding the clean out section and vertical pipe inside until ground level is reached With this installation you have to be aware of the snowdrift lin...

Page 11: ...ination MUST be at least 1 foot away from the exhaust system termination The outside air pipe on your Ashley Heritage Model 5700 stove is 1 7 8 OD The outside air connecting pipe must be at least 1 7...

Page 12: ...Air Kit is recommended The stove must be electrically grounded to the steel chassis of the mobile home with 8 GA copper wire using a serrated or star washer to penetrate paint or protective coating t...

Page 13: ...t exchanger system by the room air fan see FIGURE 10 Because a forced draft pressure is required for the combustion process inside your stove it is extremely important that the exhaust system be prope...

Page 14: ...ontrols are dis abled by default when the unit is shipped from our factory UNIT PREPARATION After carefully unpacking and reading the instructions for installing your stove you will need to perform th...

Page 15: ...nce a consistent flame has been established you can adjust the HEAT RANGE and BLOWER SPEED on the control pad to your desired settings Note The room air fan will not function until the heat exchanger...

Page 16: ...utton and the unit will begin a new start up sequence NOTE The unit will also shut down in the event of an exhaust blower failure if this is the case the unit will not re start and you must contact Cu...

Page 17: ...may prevent air from moving through the burn pot freely When replacing the burn plate be sure that it is properly seated in the burn pot NOTE It is not necessary to remove the burn pot for normal cle...

Page 18: ...on the exhaust system and on the outside air intake pipe Turn all of the controls on and make sure that they are working properly This is also a good time to give the entire stove a good cleaning thro...

Page 19: ...19 MAINTENANCE FIGURE 12 MAINTENANCE PARTS DIAGRAM...

Page 20: ...pot and try again Check that the auto start igniter is not blocked with ash or soot the igniter is located behind the 3 8 diameter hole located on the back wall of the burn pot NOTE The gasket between...

Page 21: ...21 TROUBLE SHOOTING...

Page 22: ...22 REPAIR PARTS DIAGRAM MODEL 5700...

Page 23: ...or Glass w Ashley Logo 39 88100 Gasket Exhaust Blower 15 3 88087 Glass Gasket 1 x 3 16 40 25377 Blower Access Cover 15 4 25393 Glass Retainer 41 80478 Pressure Switch 15 5 88066 5 8 Rope Gasket 42 891...

Page 24: ...24 WIRING DIAGRAM...

Page 25: ...fan will operate 115 deg F P6 Auger Load Time Time limit that the auger will feed fuel dur ing the start up sequence prior to engag ing the automatic igniter 15 sec P7 Igniter On Time Time limit that...

Page 26: ...26 SERVICE RECORD DATE SERVICE OR CLEANING PERFORMED...

Page 27: ...27...

Page 28: ...28 UNITED STATES STOVE COMPANY 227 INDUSTRIAL PARK ROAD PO BOX 151 SOUTH PITTSBURG TN 37380 800 750 2723 WWW USSTOVE COM...

Reviews: