PART IV: MAINTENANCE
35
MultiBloc MBE
MultiBloc VD Mounting
Prese di pressione
0
Coper ro
A
A
B
B
C
C
D
D
E
F
F
E
1,3,4,6
T
2
Arre
5
T
1
3
p
e
0
p
a
5
p
Br
0
3
p
e
p
a
6
5
p
Br
1
1
0
5
3
6
2
2
Prese di pressione
MB-DLE
415 - 420 B01
MB-DLE
405..412
0, 1, 2, 3, 4, 5
2
p
e
p
Br
2
p
e
3
p
a
p
Br
5
0
3
p
a
2
3
5
0
Check the filter at least once a year!
Change the filter if the pressure difference between pressure connection 1 and 3 (Fig. 1-Fig. 3)is
p > 10 mbar.
Change the filter if the pressure difference between pressure connection 1 and 3 (Fig. 1-Fig. 3) is twice as high
compared to the last check.
You can change the filter without removing the fitting.
1
Interrupt the gas supply closing the on-off valve.
2
Remove screws 1 ÷ 4 using the Allen key n. 3 and remove filter cover 5 in Fig. 5.
3
Remove the filter 6 and replace with a new one.
4
Replace filter cover 5 and tighten screws 1 ÷ 4 without using any force and fasten.
5
Perform leakage and functional test, p
max.
= 360 mbar.
Bouchon à vis G 1/8
0 Filter cover
1, 3,4 , 6 Screw plug G 1/8
2 Meter connection
5 Screw plug M14
Pressure taps
Pressure taps
position
to push
1. Position VD on VB, fig. 2+3.
2. Slide VD forward up to the stop, fig. 4.
3. Screw VD on with 2 M5 screws for each, max. 5 Nm/44 in.-lb., fig. 5/6.
4. VD can be mounted rotated by 180°, fig. 7.
1
2
3
4
5
6
7
Summary of Contents for G225X
Page 41: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Page 48: ...8 Parameters level heating engineer...
Page 90: ...50 ERROR CODE TABLE...
Page 91: ...51...
Page 92: ...52...
Page 93: ...53...
Page 94: ...54...
Page 95: ...55...
Page 96: ...56...
Page 97: ...57...
Page 98: ...58...
Page 99: ...59...
Page 100: ...60...
Page 101: ...61...
Page 102: ...62...
Page 103: ...63...
Page 104: ...64...
Page 109: ......
Page 110: ......
Page 111: ......