PART II: INSTALLATION
21
Note on electrical supply
In the case where the power supply of the AUXILIARIES of the phase-phase burner (without a neutral), for the flame detection it is
necessary to connect the RC circuit Siemens between the terminal 2 (terminal X3-04-4 in case of LMV2x, LMV3x, LMV5x, LME7x) of
the base and the earth terminal, RC466890660. For LMV5 control box, please refer to the clabeling recommendations avaible on the
Siemens CD attached to the burner
Configuration with separate electrical panel (optional)
The length of the electrical cables must comply with the provisions in the technical sheets of the equipment or the advice the company
gives at the time of the offer/contract.
Provide sufficient protections for cables and connectors, taking into consideration positioning spaces and the panel-burner tracing sur-
faces. Always consult beforehand the electrical drawings supplied in relationship to the topography of the feeding systems.
LMV2/3... - LMV5...
M
Key
C - Capacitor (22 nF , 250 V)
LME / LMV - Siemens control box
R - Resistor (1 M
Ω
)
M: Terminal 2 (LGB, LME), Terminal X3-04-4 ( LMV2x, LMV3x,
LMV5, LME7x)
RC466890660 - RC Siemens filter
Summary of Contents for G225X
Page 41: ...Service manual AZL2x LMV2x 3x Burner Management System M12916CD Rev 3 4 03 2023...
Page 48: ...8 Parameters level heating engineer...
Page 90: ...50 ERROR CODE TABLE...
Page 91: ...51...
Page 92: ...52...
Page 93: ...53...
Page 94: ...54...
Page 95: ...55...
Page 96: ...56...
Page 97: ...57...
Page 98: ...58...
Page 99: ...59...
Page 100: ...60...
Page 101: ...61...
Page 102: ...62...
Page 103: ...63...
Page 104: ...64...
Page 109: ......
Page 110: ......
Page 111: ......