
Manual – Neon 2000 Family NRT & NRM
Unidata Manual - Neon 2000 Family Remote Terminals and Modules Issue 4.0.docx
Page 24
•
The COMMS window will be displayed showing communications with the NRT/NRM.
•
Press ALT+M to enter the NRT/NRM menu.
•
From the main menu select Setup.
•
From the Setup menu select Init.
The NRT/NRM will initialise itself and attempt to communicate with the Neon server.
Once communications have been established the NRT/NRM will download any required
files and complete the initialisation process. The NRT/NRM will, after 2 or 4 minutes
respond with a PASS message. Please be patient waiting for this message.
Once all commissioning tests have been completed successfully, the NRT/NRM is field-
commissioned and ready for use.