Quality Tools for Smart Cleaning
Preparing for use
Construction of the HydroPower RO
www.ungerglobal.com
www.ungerglobal.com
15
4 Preparing for use
4.1
Construction of the HydroPower RO
4.2
1 Manometer
2 Filter selection buttons
3 Display
4 STOP button
5 RO membrane 2
6 On/Off knob
7 DI resin filter
8 3 x water outlet
9 Front plate to reach the pump reset
10 Pump ventilation slot
11 Main switch (green: On / red: Off)
12 Water inlet
13 Carbon/sediment combi pre-filter
14 RO membrane 1
15 USB connector
16 Concentrate output
17 Power cord
18 Pressure valve (with lever for manual draining of water)
10
11
12
13
14
1 2 3
4
5
6
7
9
8
15
16
17
18
Interfaces
On the front are 3 connections for attaching hoses for water
fed poles and 1 connection for the water supply. These are
standard hose connections.
Make sure that water cannot flow back into the tap water
line, e.g. through a backflow prevention device.
The water outlet for the concentrate is located at the back.
Pour the concentrate down the drain using the enclosed
concentrate hose.
At the rear there is also a USB port, which can be used to
update the software, see chapter „5.8 Software update“.