18
YK16-0010-DI-002-02
After completion of the check points and preparations before operation, start the pump
according to the following procedure.
4.2.1 Local operation
During local operation, keep the remote connector plug delivered with the Pump being
connected.
1) Supply power by turning on primary side MCCB (Molded Case Circuit Breaker).
Then
cooling fan starts.
2) Push on ON/OFF switch. Operation lamp lights up. Pump rotation becomes steady
within about 15 seconds increasing its rotation gradually.
4.2.2 Remote operation
1) Supply power by turning on primary side MCCB (Molded Case Circuit Breaker). Then
cooling fan starts.
2) Keep pump ON/OFF switch “ON” position
3) Turn on switch wired to the remote connector. Operation lamp lights up. Pump rotation
becomes steady within about 15 seconds increasing its rotation gradually.
4.3 Check points and adjustments after starting
After the pump is stared up, check the following points
1) Check there is no abnormal vibration and noise.
2) In case of processing condensable gas, please warm-up operation.
3) In case of use of N2 gas purge, please supply N2 gas.
4) Open the main valve gradually.
Starting steps
Reference items number
4.1
1)
4.1
3)
4.2
4.3
Be fully open the valve, if is
installed in the outlet side piping
↓
Check and confirm with pre-
starting check points
↓
Supply power
Pump start
↓
Check after start-up
↓
Open the main valve
Summary of Contents for CR16B
Page 2: ......
Page 3: ...準拠の宣言 ...
Page 21: ...6 YK16 0010 DI 002 02 2 5 外観寸法図 CR60B 図 2 CR60B 外観寸法図 ...
Page 42: ......
Page 44: ......
Page 45: ...Declaration of Conformity ...
Page 63: ...6 YK16 0010 DI 002 02 2 5 Outline dimensional drawing Fig 2 CR60B Outline dimensional drawing ...