3
ROOF VENT SASH
SECTION 2
Unwrap the sash and pull two side sections out as shown above.
2
4
3
Apply length of foam tape directly to the lower edge of the outer pane
of the glass unit as shown. Start by applying the tape 70mm up the
side of the glass unit and continuing to wrap around the lower edge
of the glass unit,
fi
nishing 70mm up the opposite side.
Secure sash frame together using the supplied screws in kit
(SLVTS002-6).
Once tape has been applied, assemble the sash in the sequence
shown above and ensure the tape is directed against section 2.
1
SECTION 3
Run a bead of appropriate sealant ensuring
a continuous run along the external upper
muntin bar. Please see section view for bead
positioning.
7
Locate the external upper muntin bar with the
internal muntin bar, knock into place. The
lower muntin may need to be supported from
underneath whilst secure into
fi
nal position.
6
5
Peel back any protective
fi
lm prior to
fi
tting.
Fit upper glazed unit and internal muntin bar.
Carefully lower the vent frame into position
onto the internal upper muntin bar.
70mm
VENT MAIN FRAME INTO ROOF
1
3
2
4
Remove any protective handling tape around the perimeter of the
unit prior to installation.