
-3- SCREEN PP45
25/29
Total cycles.
Number of cycles already completed. This value cannot be reset.
Time running.
Number of hours the machine is running since the last time that was
reseted.
Cycles to make.
Partial cycle counter. Once this counting finished, machine will stop
and display a message on the screen. Using the lower keys you can activate or
reset this counter.
Cycles made.
Number of cycles already finished with respect to the number displayed
in the partial counter.
From this screen and pressing the right arrow we have the following
parameters.
Cleaning program.
Activation of cleaning program.
Greaser.
Activation of centralized greasing (only if machine includes greaser option).
Device connections.
If this option is active, the different motors will keep connected
when machine is waiting for automatic cycles (vacuum pump, etc.).
Production control.
Activation of the control production, to avoid empty cycles.
Summary of Contents for TFS100
Page 2: ......
Page 4: ......
Page 14: ......
Page 16: ......
Page 26: ...2 USE INSTRUCTIONS TFS 100 10 38...
Page 28: ...2 USE INSTRUCTIONS TFS 100 12 38 3 8 ELECTRONIC CABINET...
Page 40: ...2 USE INSTRUCTIONS TFS 100 24 38...
Page 48: ...2 USE INSTRUCTIONS TFS 100 32 38 GREASERS 9372726 GREASE CUP Lubrication points...
Page 56: ......
Page 58: ...3 SCREEN PP45 2 29...
Page 82: ...3 SCREEN PP45 26 29...