
-2- USE INSTRUCTIONS TFS 100
7/38
3 VERIFICATIONS
BEFORE
INSTALLATION
3.1 TRANSPORT INSTRUCTIONS
For the transport and installation of the machine, you must prepare a forklift
truck (remember the weight of the machine).
Precautions to be taken:
-Lift the machine by its centre of gravity, which may not be the centre of the
machine.
-When you lift the machine with the forklift truck, do so by its front part
(opposite to the electrical cabinet). Verify the existence of components sticking out
of the lower part of the machine.
-Do never lift the machine by its ends or extensions.
-Always be extremely careful when lifting and transporting the machine.
-Approximate weight of the machine: 400kg.
-If you want to lift the machine with a crane, you must protect the contact
areas of the slings with the framework in order to avoid scratches and distortions.
Summary of Contents for TFS100
Page 2: ......
Page 4: ......
Page 14: ......
Page 16: ......
Page 26: ...2 USE INSTRUCTIONS TFS 100 10 38...
Page 28: ...2 USE INSTRUCTIONS TFS 100 12 38 3 8 ELECTRONIC CABINET...
Page 40: ...2 USE INSTRUCTIONS TFS 100 24 38...
Page 48: ...2 USE INSTRUCTIONS TFS 100 32 38 GREASERS 9372726 GREASE CUP Lubrication points...
Page 56: ......
Page 58: ...3 SCREEN PP45 2 29...
Page 82: ...3 SCREEN PP45 26 29...