ULB PROPRIETARY RIGHTS NOTICE
- This document contains the confidential and proprietary information of ULB. You may not
possess, use, copy or disclose this document or any information in it for any purpose without express written permission. Neither receipt
from any source, nor possession of this document, constitutes such permission. Possession, use, copying or disclosure by anyone
without express written permission of ULB is not authorized and may result in criminal and/or civil liability.
C:\Users\Service-Eng\Desktop\Mx\Manuals\ULB-R110 MANUAL_rev02.docx Page
23
of
42
Also, When set time duration is over, load will automatically disconnect and cooling fan will
continue to run for pre-set cooling time of 5 minutes (OR as set in the Maintenance
screen)..
While load test is running following activities can be done from various screens on HMI.
1) Power data display: Click <POWER DATA> button on main screen and following
power data screen will appear (see below figure-10)
Figure-10 Power data Single Phase
1) History Data for Power / Voltage / Ampere:
Click <HISTORY DATA> button on Power Data Screen and history data screen
showing past history of Wattage.
Click <Main Screen> button to switch back to Main Screen.
Note:
If USB stick is inserted on USB port on the HMI display then “SCREEN CAPTURE” button
will appear on various screens.
Click <SCREEN CAPTURE> button to copy screen image to USB Stick.