Connection of the tank system
Connection of the tank system
Connection of the tank system
Connection of the tank system
(necessary connections)
Electrical connection
Electrical connection
Electrical connection
Electrical connection
Warning!
The work may only be performed by qualified personnel.
The power supply has to be interrupted.
Necessary: 400-V-(3L/N/PE/50 Hz) plug/connection.
The fuse for each phase cannot be more than 16A.
As an option, the tank system can be factory fitted with a connection cable. The power supply is
connected directly in the control box
Please only use the provided and designated terminals.
Only use the lines with the appropriate wire size as a feed.
For the performance data, please refer to the technical data.
Air connection
Air connection
Air connection
Air connection
Compressed air supply 6 bar (oil and anhydrous)
Connection via PK 8* 1.25 pneumatic hose.
Hose connection
Luftanschluss
Air connection
Hose connection
Hose connection
Hose connection
Hose connection
Hose connecting nipple (fittings)
The system is equipped with two glue nipples by the factory.
The corresponding electrical connections are labelled 1 & 2 accordingly.
To connect a hose, the end cap has to be placed under resistance with an SW 17 wrench.
The electrical connection is made by inserting the plug located on the hose into the socket located on
the system.