4 - 5
Work Procedure
4
(3) land leveling pattern
The land leveling work may be
performed after crushing soil or
not.
The vehicle speed can be set
faster when performing the land
leveling work with soil crushed
already.
When working in a wet field, fill
the field with a sufficient amount
of water so that the trace of
plowing cannot be seen.
The border shown in the fig-
ure should be set a little narrow-
er than two times of one plowing
width.
Refer to the alternating returning
pattern for other details.
•
•
•
•
•
Moving direction
Reverse driving
Finish
A: Border
Start
(15) (11)
(9) (13)
A
(14)
(10)
(4)
(5)
(3)
(6)
()
(7)
(1)
(8)
(1)
995E003a
⊙
Turning:
TX753,TX853-영문-04(라).indd 5
2014-04-04 오후 6:10:41
Summary of Contents for TX753
Page 36: ...TX753 TX853 00 indd 4 2014 04 07 10 08 46...
Page 40: ...MEMO TX753 TX853 01 indd 4 2014 04 23 4 40 41...
Page 50: ...MEMO TX753 TX853 01 indd 10 2014 04 23 4 40 56...
Page 146: ...MEMO TX753 TX853 06 indd 4 2014 04 05 10 17 58...
Page 166: ...MEMO TX753 TX853 08 indd 8 2014 04 05 11 00 52...
Page 173: ...INDEX 1 INDEX 10 2 10 TX753 TX853 10 indd 1 2014 04 05 12 21 36...