4
3.5.1. Place the template against the wall and mark the 4 mounting
positions.
3.5.2. Drill the holes (diameter. 6 mm, depth 60 mm) and place the
plugs into the holes.
4.1.1. Feed the cable through the cable port gland.
4
Cable installation
4.1
Cable preparation
3.5
Mounting of the box on the wall
3.5.3. Hold the base part onto the wall. Insert the screws and tighten.
4.1.2. In case the cable diameter does not match with the diameter
of the gland seal, remove the plastic nut, metal ring and rubber seal
inside the gland and peel out some of the break out rubber rings up to
the right diameter.
4.1.3 Prepare the cable according to the drawing, Strip and clean
the cable over a length of 1800 mm. and cut the strength member at
60 mm length.
1800 mm
60 mm