12
FP8K-B / FP8K-DX / FP8K-DX-XLT
Jun 2017-A
19. Install Cable Guide Bolts (#21A) thru the side of the Crossbeam Latch Plates at each end, as
illustrated in Fig.8 below. One Guide Bolt will be installed at end of both Crossbeams.
Note: Cable Guide Bolts assists in keeping the Cables properly engaged to the Pulleys.
Fig. 8
20. Install Lock Rods & Linkage components per the drawing Fig.9 below. Ensure to install Eye
bolts (#69) to outside / middle of each Crossbeam, secure each Eye bolt with Hex Nut.
Note: Ensure the ‘front to back’ Linkage Rods are properly routed through guide ring
weldments, located on the underside of the Mainside Runway.
Fig. 9
(Also see Exploded View
Details on Page 24)
Cable Guide Bolt
Summary of Contents for FP8K-B
Page 23: ...23 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 1...
Page 24: ...24 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 2...
Page 25: ...25 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 3...
Page 26: ...26 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 4 41...
Page 27: ...27 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 5...