5. Now unbolt the top Mainside Runway (#51) taking the necessary safety precautions to support
runway, as it will need to be flipped over.
Note: Using some type of hoist is recommended to
carefully flip the Runway over, so it’s no longer upside down.
6. Locate the Mainside Runway in your bay with the Hydraulic Fitting (#86) facing toward your
previously chosen corner for the Power Unit.
7. Unbolt all four Columns from the shipping brackets and place the Power Unit Column (#1) with
mount bracket in the above chosen corner. Arrange the other three Sub Columns (#2) in the
remaining corners.
8. Unpack the Crossbeams, Ramps, Drip Trays, and Caster Kit from the lower Sub Runway.
Remove the Safety Latch covers (#14) from Crossbeams. They will be reinstalled later.
9.
Arrange the Crossbeams so that the Latches
’ Linkage Rods are facing outward and the Short
Rod (#70) is closest to the Power Unit Column, as shown below in Fig.3.
Fig. 3
Short Rod
Summary of Contents for FP8K-B
Page 23: ...23 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 1...
Page 24: ...24 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 2...
Page 25: ...25 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 3...
Page 26: ...26 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 4 41...
Page 27: ...27 FP8K B FP8K DX FP8K DX XLT Jun 2017 A EXPLODED VIEW 5...