background image

41

6

 

MAINTENANCE 

6.1  Suggested Maintenance Schedule 

Operation 

Tools required 

Execution 

Period 

Operator 

Technician 

General cleaning. 

A slightly moist, non-
abrasive cloth. 

4 months

Visual check that all 
components of the metal 
detector are undamaged. 

•  

4 months 

Visual inspection of connectors 
and  power supply cables. 

4 months

Floor anchoring inspection: 
ensure that the archway is 
firmly anchored to the floor. * 

 • 

4 months 

Cross-bars inspection: ensure 
that the cross-bar screws are 
properly tightened. 

Supplied Allen Key N°8 

 • 

4 months 

Control unit inspection: ensure 
that the mounting screws are 
properly tightened. 

Supplied Allen Key N°5. 

 • 

4 months 

Verification of the visual 
indicators. 

•  

Daily (mandatory)

At shift changes

In case of doubt of
proper operation

Operator-level functionality 
test. 

OFV kit or Test piece 
specified by the Security 
Standard in use. 

•  

Daily (mandatory)

At shift changes

In case of doubt of
proper operation

Technical-level functionality 
test. 

TFV&FGA kit. 

6-12 months

Verification of the  calibration. 
Re-certification of the  
calibration 

Test piece specified by the 
Security Standard in use. 

 • 

12 months (mandatory) 

Battery replacement. 

Supplied Allen Key N°5 
2 batteries. 

Recommended: 3 years
(maximum:  5 years)

6.2 Diagnosis 

Generic Messages 

Display Message

 

Sounder 

Possible cause 

Recommended action 

FAULT 
RX ERR 

fault in the receiving  section. 

• Check the choice of transmission channel (function CH)

if more than one metal detector is installed (see related
para. in ‘Installation’ section).

• replace the control unit .

FAULT 
GATE rx 

FAULT 
GATE tx 

x : 1, 2, … 

connecting cable damaged or 
disconnected.  

• check the connections between control unit and

antenna (GATE rx: check the RX antenna; GATE tx:
check the TX antenna).

• check that no nails or screws have been driven into the

antennas without prior consultation with the technical
department

• replace the connecting cable.

Damaged control unit. 

Replace the control unit. 

Damaged antenna. 

Replace the antenna. 

PROG 

Loading of data via the LD or IS 
commands from an 
unprogrammed memory cell. 

Use a pre-programmed memory cell. 

WAIT 

Metal detector not operative. 

Temporary adjustment phase following to the modification 
of either the receiving or the transmitting parameters (e.g.: 
channel ‘CH’): wait for normal functioning indication. 

303-670-1099

Summary of Contents for 02PN20

Page 1: ...lutions each model offers the best cost performance ratio for its specific application Options Some functions parts indicated as options in this manual are included as default in high level models Ell...

Page 2: ...S TO THE LOCAL PROGRAMMING PHASE USING THE PASSWORD 31 4 3 2 FREE ACCESS TO LOCAL PROGRAMMING PHASE WITHOUT PASSWORD 31 4 3 3 COMMAND EXECUTION IN LOCAL PROGRAMMING 32 4 3 4 EXIT FROM LOCAL PROGRAMMIN...

Page 3: ...n of the earth ground safety terminal will render the device dangerous Intentional cutting or disconnection is strictly forbidden Whenever there is any suggestion that the level of protection has been...

Page 4: ...ially dangerous substances Do not short circuit the contacts serious risk of burning and breakage Do not dispose of battery in fire danger of explosion Any maintenance or repair involving the device b...

Page 5: ...c casing or metal casing is designed to be attached directly to the crossbar of the archway An embedded Infra Red interface allows the use of an accessory remote control unit which acts as the control...

Page 6: ...na Rf Reflectors for transit counting options on column version C1 crossbar fitted with holes for mounting the control unit C2 crossbar without holes panel shape version K ON OFF special key Indicator...

Page 7: ...et LAN interface Web server for set up and remote data log Real Time clock with battery backup Non volatile Memory for Metal Detector events storage wireless Wi Fi interface APSIM3Plus version only su...

Page 8: ...is intended for upgrading the standard version to outdoor applications according to IEC 60950 22 This kit includes shelters crossbar protection covers for power supply and waterproof power supply ada...

Page 9: ...mperature 20 C to 70 C on demand 37 C to 70 C Storage temperature 37 C to 70 C Relative humidity 0 to 95 without condensation Standard Version UW 115 4 5 UW 50 2 630 00 24 3 4 6 5 1 4 UW 2255 88 8 205...

Page 10: ...30 24 8 6 5 1 4 2050 80 7 UW 115 4 5 UW 50 2 UW 170 6 7 UW 660 00 26 340 13 4 UW 155 6 1 2035 80 1 2275 89 6 401 15 8 440 17 3 990 39 560 22 UW 362 14 3 Dimensions UW 720mm OPTION 760mm or 820mm panel...

Page 11: ...ration This configuration can be applied in outdoor sheltered permanent installations or outdoor non sheltered short term installations single event entrance 3 1 1 Examples of possible sources of inte...

Page 12: ...ced in direct contact with the MD 6 Sources of vibration Unstable Floor The MD gate shall be anchored to a stable floor Avoid installing on wood or metal platforms unless necessary In this latter case...

Page 13: ...y the Security Authority Components needed Unpacking Scissors and Pliers Phillips screwdriver n 1 Kit C E I A FGA TFV Metal free clothes Clean Tester Tracksuit Gym shoes No metal personal effects meta...

Page 14: ...RX parts Configuration A Configuration B Configuration A Configuration B XRU XRU XRU XRU Configuration A Configuration B Configuration A Configuration B Typical application fitted with two Metal Detec...

Page 15: ...mp protection cover of the lower connection module ccp protection cover of CU control unit and C1 crossbar cp protection cover of C2 crossbar Pictures of main components Positioning the panels Tilt do...

Page 16: ...t of the panel taking care that the logo is facing the floor Attach the C2 crossbar with no holes to the upper part of the panel making sure that the logo is facing up RX C1 C2 Configuration B with TX...

Page 17: ...en key AW2 or TX1 to free them Configuration A Lift the archway placing it on the supports S1 and S2 Attach the control unit to the lower crossbar using vc screws and AW2 Allen key included in the ins...

Page 18: ...g panel connector Lock the cable connectors using the short screwdriver cK included into the installation kit Insert the cables into the crossbar groove Fix the cables in position using the clips on t...

Page 19: ...C2 Each cap s secured by a short cord to a cable clip Remount covers cp Attach the protection cover ccp of the crossbar C1 using the hooks h and the knobs vp taking care to push it towards the panel c...

Page 20: ...river photocell vc control unit mounting screw PC Protection covers ccp protection cover of CU control unit and C1 crossbar Pictures of main components Positioning the columns Place F spacers on the f...

Page 21: ...les for the control unit close to the TX column Insert the crossbar guide pins into the holes on the inside of the column Configuration A TX RX Configuration B with TX column on the right when facing...

Page 22: ...guration B Connecting the control unit Connect the cables coming from the control unit as illustrated in the figure below Connect each cable to the column connector winding the cable in excess if nece...

Page 23: ...PH2 AW Photocells Reflectors Phillips screwdriver and Allen wrench included in the installation kit Remove the pc cap using AW key pc Open the Ph photocell module using a PH2 cross head screwdriver Pa...

Page 24: ...ability and acting as an adapter allow the archway to be easily relocated In order to prevent the archway from tipping over in case of bumps the stable anchoring to the ground is anyway mandatory Meta...

Page 25: ...ribed in the previous step but passing the output cable of the AC DC adapter through one of the strain reliefs present on the protection cover Connect the input cable of the AC DC adapter to the mains...

Page 26: ...ext step use the UP and DOWN keys to change a numeric value or an answer Y yes to N no and vice versa In the following any operator s action is indicated between and OTS function can be executed also...

Page 27: ...TX mains ALARM VOLUME SELECT ENTER AV ENTER Selection of the Alarm Volume MINIMUM VOLUME SELECT ENTER MV ENTER Selection of the Minimum Volume lower limit for alarm volume adjustment ALARM TONE SELEC...

Page 28: ...onto the X ray unit belt Subject the floor to normal and above normal stress walk heavily change direction In case of strong gusts of air or wind EVA function can be useful to compensate archway vibra...

Page 29: ...d to be compatible For safety reasons anchoring the unit to the floor is mandatory Anchoring methods shall be agreed prior to proceeding with the following steps Marble or tiled floors or Carpeted flo...

Page 30: ...o bumps or mechanical exertion 3 7 Personalisation 3 7 1 Settings check If required by the specifications of the Security Authority change the programming setting to refine the operating mode Enter pr...

Page 31: ...will be terminated automatically if no commands are entered for a period of 2 minutes 4 3 Local programming Use the keypad on the inside panel of the control unit The PROG key is used to enter and ex...

Page 32: ...ower supply and serial communication cables together in order to avoid loops ATTENTION in order to avoid any damage to the PC s interface make sure that the cable does not include a connection to pin...

Page 33: ...TER P _10000 number of passages through the antenna TA_ 2350 the total number of passages with alarm TR_23 5 the alarms passages ratio as a percentage MA_ 1500 number of passages with alarm due to a m...

Page 34: ...92 168 0 101 IP I192 168 0 101 IS International Security Standard 1 30 C R Selects a security level corresponding to an international standard During normal operation the current Security Level is dis...

Page 35: ...stance will be required from C E I A personnel OFV Functionality check at operator level C Activates the OFV test For details of the procedure see the instructions included in the OFV kit OTS One Touc...

Page 36: ...ach command is changed by entering the opposite value to the current one to the right of the character If the user does not wish to change the command state he she can simply press ENTER and the curso...

Page 37: ...ction module power indicator entry pacing lights entry side GREEN transit allowed RED busy transit not allowed zone alarm indication exit side in case of alarm a group of LEDs lights up to pinpoint th...

Page 38: ...l be performed according to local Security Authority procedures taking into account that The indication given through light bars that illuminate where the presence of an object is detected is solely m...

Page 39: ...ming phase starts the last used command will appear Press the arrow keys to select the AV Alarm Volume or AT Alarm Tone function if a different one is displayed Press the ENTER key to change the AV se...

Page 40: ...eiver antenna A in the form of an archway made up of a transmitter part TX a receiver part RX a power supply adapter PSA FG PCU TX RX A CU PSA R RX PSA TX CU RX PSA TX CU Block diagram of a metal dete...

Page 41: ...e calibration Test piece specified by the Security Standard in use 12 months mandatory Battery replacement Supplied Allen Key N 5 2 batteries Recommended 3 years maximum 5 years 6 2 Diagnosis Generic...

Page 42: ...ing a chip card try at first to perform again the operation completely and correctly If the self diagnosis message appears again carry out the recommended action listed in the following table Display...

Page 43: ...out FGA step Increase LC parameter setting Excessive sensitivity at ground level f i detection of shoes Excessive sensitivity at ground level Start OTS procedure and carry out FGA step Decrease LC pa...

Page 44: ...rtment with batteries 49510 49510 49510 49510 49510 Pb 12V 9Ah battery 36891 36891 36891 36891 36891 100 240V 100W IP67 Power supply adaptor 48092 48092 48092 48092 48092 100 240V 80W Power supply ada...

Reviews: