![Turbosol Beton Master Operation And Maintenance Manual Download Page 21](http://html1.mh-extra.com/html/turbosol/beton-master/beton-master_operation-and-maintenance-manual_1181315021.webp)
INSTALLATION
5
561270 - IS19/07 - EN
21/58
5.3
CONCRETE PIPING FITTINGS
Make sure the fittings are clean and in good order at all times.
Check the rubber gasket (FIG.17-REF.1) is present and fully fasten the levers (FIG.17-REF.2) when connecting the piping
segments.
Lock coupling with safety pin to avoid inadvertent openings (FIG.17A-RIF.3).
1
2
3
3
FIG.17 FIG.17A
5.4
CONNECTIONS
5.4.1 Concrete grid and vibrator
- Connect the electric vibrator's plug (FIG.19-REF.1) to the machine socket (FIG.19-REF.2) located on the hydraulic tank.
Close the door after connection.
When pumping shotcrete you will need to use the shotcrete nozzle and the 15 mm slotted grid with the electric vibrator.
- Unscrew the shock absorber's anchoring bolts (FIG. 18.REF. 1).
- Remove the concrete grid, replace it with the shotcrete grid and fasten it to the shock absorbers using the bolts.
- Open the small door, connect the electric vibrator's plug (FIG. 19-REF. 1) to the machine's socket (FIG. 19-REF. 2) located on
the hydraulic oil tank and close the door.
Summary of Contents for Beton Master
Page 1: ...Serial number Year OPERATION AND MAINTENANCE MANUAL BETON MASTER IS19 07 561270 EN ORIGINAL ...
Page 2: ......
Page 5: ...11 2 WARRANTY 57 ...
Page 6: ......
Page 8: ...1 CE DECLARATION 8 58 561270 IS19 07 EN ...
Page 14: ...3 TECHNICAL DESCRIPTION 14 58 561270 IS19 07 EN ...
Page 18: ...4 TRANSPORTATION AND HANDLING 18 58 561270 IS19 07 EN ...
Page 24: ...5 INSTALLATION 24 58 561270 IS19 07 EN ...
Page 28: ...6 SAFETY 28 58 561270 IS19 07 EN ...
Page 52: ...9 SCRAPPING 52 58 561270 IS19 07 EN ...
Page 55: ...TROUBLESHOOTING 10 561270 IS19 07 EN 55 58 ...
Page 56: ...10 TROUBLESHOOTING 56 58 561270 IS19 07 EN ...
Page 58: ...11 RESPONSIBILITY OF THE OPERATOR 58 58 561270 IS19 07 EN ...