
are within 1/2” of touching (Photo 28). Once
gangs are positioned in the correct location,
tighten all u-bolts and/or fasteners to the correct
torque. Please see Bolt Torque Chart (Page 45)
for proper torque information.
Remove the SMV sign & mounting bracket from
the cardboard box in Photo 18. Mount the SMV
sign to the mounting bracket using 1/8” x ½” Gr.
2 round head machine screws. Now mount the
mounting bracket to the rear of frame using
5/16” x 1” Gr. 2 carriage bolts (Photo 29). When
mounted, tighten nuts accordingly.
Photo 29
Dealer Instructions 15
Summary of Contents for MVT1710
Page 1: ...MVT17_16154_06 2018 VT1710 VT1713 VT1712 VT1715 VERTICAL TILLAGE O P E R A T O R S M A N U A L...
Page 23: ...Dealer Instructions 20...
Page 24: ...Operation 21 45 3 8 3 8...
Page 29: ...Owner Service 26...
Page 31: ...Assembly Schematic 28 DUAL WHEELS ARE STANDARD ON ALL MODELS MVT Assembly Schematic Figure 3...
Page 48: ...Bolt and Torque Chart 45 MVT Series gang bolt torquee 350lbs ft then tighten nut clockwise 180...
Page 49: ...Notes 46 Notes...
Page 50: ...2018 Monroe Tufline Manufacturing Inc All Rights Reserved PART NO 16154...