
Chocks should now be removed and frame
should be rolled off of pallet. Leave in open
area for further assembly.
The next steps will be attaching the gang
beams & gangs to frame. Determine which
beams are front and which are rear by looking
at Figures 7 & 8 in Parts Catalog. Remove the
5/8” x 6” Gr. 5 bolts from the front and rear slide
plates (Photo 21) to accommodate the gang
beams. Slide the rear beams through the slot in
frame (Photo 22) till they meet the rear slide
plate in center of frame. Repeat the same pro-
cedure for the front gang beams. Insert the 5/8”
x 4 1/16” bushing into the hole at the inside end
of the gang beam (Photo 23). Reinsert the 5/8”
x 6” Gr. 5 bolt downward through the hole in the
18). Connect the safety chain to the tongue
using the 1” x 6” Gr. 5 bolt removed from box
(Photo 19). Once all bolts are applied, tighten
all nuts. Please see Bolt Torque Chart (Page
45) for proper torque information. The unit
should now look like Photo 20 on Page 13.
Photo 20
Photo 21
Photo 22
Photo 23
Photo 24
Dealer Instructions 13
WARNING
Summary of Contents for MVT1710
Page 1: ...MVT17_16154_06 2018 VT1710 VT1713 VT1712 VT1715 VERTICAL TILLAGE O P E R A T O R S M A N U A L...
Page 23: ...Dealer Instructions 20...
Page 24: ...Operation 21 45 3 8 3 8...
Page 29: ...Owner Service 26...
Page 31: ...Assembly Schematic 28 DUAL WHEELS ARE STANDARD ON ALL MODELS MVT Assembly Schematic Figure 3...
Page 48: ...Bolt and Torque Chart 45 MVT Series gang bolt torquee 350lbs ft then tighten nut clockwise 180...
Page 49: ...Notes 46 Notes...
Page 50: ...2018 Monroe Tufline Manufacturing Inc All Rights Reserved PART NO 16154...