![TUBESCA-COMABI NEOLIUM LINE 200 Assembly And Operating Manual Download Page 70](http://html1.mh-extra.com/html/tubesca-comabi/neolium-line-200/neolium-line-200_assembly-and-operating-manual_1179198070.webp)
106-A000035565 - ind.D - 11/2021
70
2-8. NEOLIUM LINE 200/250 and 300 8.00 platform assembly
•
Closely follow the whole of §2-6 to assemble the NEOLIUM 200/250 and 300 6m platform.
•
For the 8m platform and above, the stab extension set replaces the standard stabilisers.
•
Assemble the 2 x 2.00m extensions by following § 2-1-5.
•
Mount the platform with the hatch on rung no. 31 by following § 2-1-6.
•
Mount the 4 braces on rungs no. 33, and then no. 35, by following § 2-1-8.
•
Position the toeboards by following § 2-1-8.
Collar clamp position:
Between the 2
nd
and 3
rd
rungs,
and the 14
th
and 15
th
rungs
Summary of Contents for NEOLIUM LINE 200
Page 8: ...106 A000035565 ind D 11 2021 8 1 3 2 Version double largeur 400 et 600 ...
Page 52: ...106 A000035565 ind D 11 2021 52 1 3 2 Double width version 400 and 600 ...
Page 96: ...106 A000035565 ind D 11 2021 96 1 3 2 Ausführung in doppelter Breite 400 und 600 ...
Page 140: ...106 A000035565 ind D 11 2021 140 1 3 2 Versión de ancho doble 400 y 600 ...
Page 184: ...106 A000035565 ind D 11 2021 184 1 3 2 Versione larghezza doppia 400 e 600 ...
Page 228: ...106 A000035565 ind D 11 2021 228 1 3 2 Versie dubbele breedte 400 en 600 ...
Page 272: ...106 A000035565 ind D 11 2021 272 1 3 2 Versão de largura dupla 400 e 600 ...
Page 311: ...106 A000035565 ind D 11 2021 311 ...