![TUBESCA-COMABI NEOLIUM LINE 200 Assembly And Operating Manual Download Page 67](http://html1.mh-extra.com/html/tubesca-comabi/neolium-line-200/neolium-line-200_assembly-and-operating-manual_1179198067.webp)
106-A000035565 - ind.D - 11/2021
67
2-4. NEOLIUM LINE 200/250 and 300 4.00m platform assembly
•
Closely follow the whole of §2 to assemble the NEOLIUM 200/250 and 300 2m platform.
•
Assemble the 2 x 2.00m extensions by following § 2-1-5.
•
Mount the platform with the hatch on rung no. 15 by following § 2-1-6.
•
Mount the 4 braces on rungs no. 17, and then no. 19, by following § 2-1-7.
•
Position the toeboards by following § 2-1-8.
2-5. NEOLIUM LINE 200/250 and 300 5.00m platform assembly
•
Closely follow the whole of §2-3 to assemble the NEOLIUM 200/250 and 300 3m platform.
•
Assemble the 2 x 2.00m extensions by following § 2-1-5.
•
Mount the platform with the hatch on rung no. 19 by following § 2-1-6.
•
Mount the 4 braces on rungs no. 21, and then no. 23, by following § 2-1-7.
•
Position the toeboards by following § 2-1-8.
Summary of Contents for NEOLIUM LINE 200
Page 8: ...106 A000035565 ind D 11 2021 8 1 3 2 Version double largeur 400 et 600 ...
Page 52: ...106 A000035565 ind D 11 2021 52 1 3 2 Double width version 400 and 600 ...
Page 96: ...106 A000035565 ind D 11 2021 96 1 3 2 Ausführung in doppelter Breite 400 und 600 ...
Page 140: ...106 A000035565 ind D 11 2021 140 1 3 2 Versión de ancho doble 400 y 600 ...
Page 184: ...106 A000035565 ind D 11 2021 184 1 3 2 Versione larghezza doppia 400 e 600 ...
Page 228: ...106 A000035565 ind D 11 2021 228 1 3 2 Versie dubbele breedte 400 en 600 ...
Page 272: ...106 A000035565 ind D 11 2021 272 1 3 2 Versão de largura dupla 400 e 600 ...
Page 311: ...106 A000035565 ind D 11 2021 311 ...