106-A000035565 - ind.D - 11/2021
63
2-1-6. Mounting the platform with a hatch
•
Position the platform on rung no. 7.
2-1-7. Mounting the 4 braces
4.
To mount the braces, sit on the platform with the hatch, then:
5.
Fix the 2 upper braces to rung no. 11 on each side of the scaffolding; ensure that each brace is
pushed up against the upright by following §2.1.2.
6.
Fix the 2 lower braces to rung no. 9 on each side of the scaffolding; ensure that each brace is
pushed up against the upright by following §2.1.2.
Lock the platform by pushing the fork
on either side
2
3
1
Summary of Contents for NEOLIUM LINE 200
Page 8: ...106 A000035565 ind D 11 2021 8 1 3 2 Version double largeur 400 et 600 ...
Page 52: ...106 A000035565 ind D 11 2021 52 1 3 2 Double width version 400 and 600 ...
Page 96: ...106 A000035565 ind D 11 2021 96 1 3 2 Ausführung in doppelter Breite 400 und 600 ...
Page 140: ...106 A000035565 ind D 11 2021 140 1 3 2 Versión de ancho doble 400 y 600 ...
Page 184: ...106 A000035565 ind D 11 2021 184 1 3 2 Versione larghezza doppia 400 e 600 ...
Page 228: ...106 A000035565 ind D 11 2021 228 1 3 2 Versie dubbele breedte 400 en 600 ...
Page 272: ...106 A000035565 ind D 11 2021 272 1 3 2 Versão de largura dupla 400 e 600 ...
Page 311: ...106 A000035565 ind D 11 2021 311 ...