106-A000035565 - ind.D - 11/2021
65
2-1-9. Assembling the stabilisers
•
The 4 stabilisers are attached to the uprights between the 1
st
and 2
nd
rungs, and the 10
th
and
11
th
rungs.
•
Lock the stabiliser clamp on to the upright using a wing nut.
•
Repeat steps 1 and 2 a further 4 times.
C.
Ensure that
the clamp
is locked in
place
Ensure that the clamp
is locked in place
1
2
3
Check “length” and
“width” according to table §3
-8-2 by following table §2-8-2 for
NEOLIUM 200-250 and 300 and table §2-8-3 for NEOLIUM 400 and 600.
Summary of Contents for NEOLIUM LINE 200
Page 8: ...106 A000035565 ind D 11 2021 8 1 3 2 Version double largeur 400 et 600 ...
Page 52: ...106 A000035565 ind D 11 2021 52 1 3 2 Double width version 400 and 600 ...
Page 96: ...106 A000035565 ind D 11 2021 96 1 3 2 Ausführung in doppelter Breite 400 und 600 ...
Page 140: ...106 A000035565 ind D 11 2021 140 1 3 2 Versión de ancho doble 400 y 600 ...
Page 184: ...106 A000035565 ind D 11 2021 184 1 3 2 Versione larghezza doppia 400 e 600 ...
Page 228: ...106 A000035565 ind D 11 2021 228 1 3 2 Versie dubbele breedte 400 en 600 ...
Page 272: ...106 A000035565 ind D 11 2021 272 1 3 2 Versão de largura dupla 400 e 600 ...
Page 311: ...106 A000035565 ind D 11 2021 311 ...