106-A000035565 - ind.D - 11/2021
60
Chapter 2:
Assembly of the single and double width version
2-1. NEOLIUM LINE 200/250 and 300 2.00m platform assembly
Scaffolding must be erected, dismantled and modified by at least 2 people.
The working height is defined according to the user and the task to be carried out
•
Lock the castor wheels before each use by applying the brake with your foot.
2-1-1. Assembling the castor wheels
•
Insert 2 castors into a base ladder, then do the same for the second base ladder.
2-1-2. Assembling the braces
•
Attach the 2 braces to rung no. 1 by following steps 1.1 to 1.4.
•
Lock the castor wheel attachment by placing the
wing bolt in one of the two holes. provided.
1.4
1.3
4
Ensure the lock is correctly
engaged
Lock Colour: GREY
F
1.2
X2
1.1
Summary of Contents for NEOLIUM LINE 200
Page 8: ...106 A000035565 ind D 11 2021 8 1 3 2 Version double largeur 400 et 600 ...
Page 52: ...106 A000035565 ind D 11 2021 52 1 3 2 Double width version 400 and 600 ...
Page 96: ...106 A000035565 ind D 11 2021 96 1 3 2 Ausführung in doppelter Breite 400 und 600 ...
Page 140: ...106 A000035565 ind D 11 2021 140 1 3 2 Versión de ancho doble 400 y 600 ...
Page 184: ...106 A000035565 ind D 11 2021 184 1 3 2 Versione larghezza doppia 400 e 600 ...
Page 228: ...106 A000035565 ind D 11 2021 228 1 3 2 Versie dubbele breedte 400 en 600 ...
Page 272: ...106 A000035565 ind D 11 2021 272 1 3 2 Versão de largura dupla 400 e 600 ...
Page 311: ...106 A000035565 ind D 11 2021 311 ...