106-A000035565 - ind.D - 11/2021
86
2-25. Assembly on uneven ground (optional
–
Out of scope NF EN 1004-1)
Chapter 3:
After assembly and before use
Correct assembly should be verified by the appropriately trained person who has been appointed by the
company’s on
-site safety delegate.
The checks will cover:
•
Whether the structure is in good condition.
•
The completely assembled structure.
•
Verifying whether the mobile tower is correctly assembled and complete.
•
Verifying whether the mobile tower is vertical or if it needs adjusting.
•
Verifying that there is no environmental change which may affect the safe use of the mobile tower.
•
Verifying that the stabilisers and the stabiliser legs comply with the instruction manual.
•
The brakes (locked wheels).
•
The cushioning (to compensate for localised defects in flatness).
ALWAYS
follow the instruction manual supplied with the product.
1.00m
max
Base ladder
1.00m extension
2.00m extension
This configuration only applies to
stairs and cannot be used on a sloped
surface.
Check that the castor wheel brakes
function correctly.
Summary of Contents for NEOLIUM LINE 200
Page 8: ...106 A000035565 ind D 11 2021 8 1 3 2 Version double largeur 400 et 600 ...
Page 52: ...106 A000035565 ind D 11 2021 52 1 3 2 Double width version 400 and 600 ...
Page 96: ...106 A000035565 ind D 11 2021 96 1 3 2 Ausführung in doppelter Breite 400 und 600 ...
Page 140: ...106 A000035565 ind D 11 2021 140 1 3 2 Versión de ancho doble 400 y 600 ...
Page 184: ...106 A000035565 ind D 11 2021 184 1 3 2 Versione larghezza doppia 400 e 600 ...
Page 228: ...106 A000035565 ind D 11 2021 228 1 3 2 Versie dubbele breedte 400 en 600 ...
Page 272: ...106 A000035565 ind D 11 2021 272 1 3 2 Versão de largura dupla 400 e 600 ...
Page 311: ...106 A000035565 ind D 11 2021 311 ...