
Note
To aid orientation, there are coloured dots on each connector. The coloured
dots identify the bottom face of the connector.
When inserting the connectors, carefully locate the connectors into their
sockets, then use a suitable flat ended pin punch to push the connectors fully
home. An audible click can be heard when the connectors are fully inserted.
Do not use sharp tools, such as a flat bladed screw driver, to insert the
connectors.
1
Switch housing electrical connectors
1.
Connect the left hand switch housing electrical connectors.
10.
Use a new cable tie to secure the wiring harness to the switch housing.
11.
Locate the master cylinder to the handlebars and position the clamp with the UP
arrow pointing upwards. Do not tighten the clamp bolts at this stage.
12.
Align the split line of the master cylinder clamp to the alignment mark on the top
surface of the handlebar. Tighten the clamp fixings, upper one first, to
8 Nm
.
13.
3
1
4
2
Service Manual - Scrambler 1200 XC
635 of 640
Summary of Contents for Scrambler 1200 XC
Page 67: ...ckju Evaporative Hose Routing Service Manual Scrambler 1200 XC 67 of 640 ...
Page 134: ...Exploded View Clutch Cover Service Manual Scrambler 1200 XC 134 of 640 ...
Page 135: ...Exploded View Alternator Cover Service Manual Scrambler 1200 XC 135 of 640 ...
Page 159: ...Exploded View Cylinder Head Service Manual Scrambler 1200 XC 159 of 640 ...
Page 291: ...Exploded View Gear Selector Service Manual Scrambler 1200 XC 291 of 640 ...
Page 333: ...Oil Circuit Diagram Service Manual Scrambler 1200 XC 333 of 640 ...
Page 374: ...Exploded View Fuel Pump Service Manual Scrambler 1200 XC 374 of 640 ...
Page 375: ...Exploded View Fuel Rail Throttles and Injectors Service Manual Scrambler 1200 XC 375 of 640 ...
Page 377: ...Exploded View Exhaust System Service Manual Scrambler 1200 XC 377 of 640 ...
Page 378: ...Exploded View Evaporative System if fitted Service Manual Scrambler 1200 XC 378 of 640 ...
Page 619: ...Service Manual Scrambler 1200 XC 619 of 640 ...