5. Installation
11. Connect the cables from battery 1+ to BAT+ bus bar, battery 10- to BATN bus bar, battery 11+ to BATN bus bar, battery
20- to BAT- bus bar and the layer connect cables (Figures 5-41A and 5-41B).
Notes:
• For these connections, refer to the wiring diagram in Figure 5-41C.
• This manual may be downloaded in color at tripplite.com, which shows the cables in corresponding colors:
Red = Positive
Blue = Center Tap
Black = Negative
Figure 5-41A
Figure 5-41B
Summary of Contents for BP240V09
Page 38: ...38 5 Installation Figure 5 32 Wiring Diagram for Installation of 80 Batteries ...
Page 46: ...46 5 Installation Figure 5 41C Front Layer 3 Layer 2 Layer 1 Rear ...
Page 49: ...49 5 Installation Figure 5 44A 2 Remove top right side and left side plates Figure 5 44 ...
Page 54: ...54 5 Installation 14 Reinstall the covers and the screws Figure 5 53 Figure 5 53 ...
Page 113: ...113 5 Instalación Figura 5 32 Diagrama de Cableado para la Instalación de 80 Baterías ...
Page 121: ...121 5 Instalación Figura 5 41C Front Layer 3 Layer 2 Layer 1 Rear ...
Page 129: ...129 5 Instalación 14 Reinstale las cubiertas y los tornillos Figura 5 53 Figura 5 53 ...
Page 196: ...196 5 Installation Figure 5 41C Front Layer 3 Layer 2 Layer 1 Rear ...
Page 204: ...204 5 Installation 14 Réinstaller les couvercles et les vis Figure 5 53 Figure 5 53 ...