37
5. Installation
BAT- fuses and
BAT+ fuses
(2 x 160A)
Breaker
Positive Side Battery Groups:
10 Batteries (x4)
Breaker
External Battery Cable
Connectors
Negative Side Battery Groups:
10 Batteries (x4)
Figure 5-31: Negative Side Battery View
Figure 5-30: Positive Side Battery View
5.4.2 Battery Connection
With the battery cabinet placed in position, remove the left and right panels of the cabinet. Remove the right and left cover
plate of the battery pack and the battery flapper to install the batteries.
The BP240V09 / BP240V09K / BP240V09-NIB battery cabinet contains 80 batteries (12V 9Ah), divided into four groups
connected in parallel for use. Each group consists of 20 batteries in series (BAT+, N and BAT-).
Summary of Contents for BP240V09
Page 38: ...38 5 Installation Figure 5 32 Wiring Diagram for Installation of 80 Batteries ...
Page 46: ...46 5 Installation Figure 5 41C Front Layer 3 Layer 2 Layer 1 Rear ...
Page 49: ...49 5 Installation Figure 5 44A 2 Remove top right side and left side plates Figure 5 44 ...
Page 54: ...54 5 Installation 14 Reinstall the covers and the screws Figure 5 53 Figure 5 53 ...
Page 113: ...113 5 Instalación Figura 5 32 Diagrama de Cableado para la Instalación de 80 Baterías ...
Page 121: ...121 5 Instalación Figura 5 41C Front Layer 3 Layer 2 Layer 1 Rear ...
Page 129: ...129 5 Instalación 14 Reinstale las cubiertas y los tornillos Figura 5 53 Figura 5 53 ...
Page 196: ...196 5 Installation Figure 5 41C Front Layer 3 Layer 2 Layer 1 Rear ...
Page 204: ...204 5 Installation 14 Réinstaller les couvercles et les vis Figure 5 53 Figure 5 53 ...