1   Ensure the appliance is switched off.

2   Plug the appliance into the separate Run Test socket.

3   Connect the return lead to the 

SafeTcheck

 via the 

Earth Return Socket.

4   Connect the Clamp of the Return Lead to a convenient  

earthed metal point on the appliance under test.

WaRNINg

Upon completion of a safety test and subsequent  
removal of test lead, please ensure all switches, speed  
or thermostat controls are returned to their ‘OFF’ or 
minimum position.

5   Switch the appliance on.

6   Select Class 1 Run Test under Other  

APPLIANCE menu (F1 and F2 keys move the  
selection of mode up or down respectively)

7   Press START button and follow the screen  

instructions. The appliance will operate for  
up to 20 seconds during the run test.

8   For Class I appliances requiring a longer than  

normal run test duration, move to Long Class I  
Run under OTHER APPLIANCE menu.

Note 1:

 

Pressing RESET at any point during the Run  

Test will shorten the test duration. This does not invalidate 
the test result. 

Note 2:

 If Data Logging is switched on then additional 

information will be requested. See section entitled  
”Data Logging” 

WaRNINg

The appliance will operate for up to 20 seconds in the 
run test mode. Ensure rotating parts or heating elements 
are able to operate safely. Appliances such as drills, angle 
grinders etc should be firmly restrained during the run test.

Run testing earthed (class 1) appliances

SWITCh APPLIANCE ON & SET 

APPLIANCE ThERMOSTAT OR 

SPEED CONTROL TO MAxIMuM

Summary of Contents for SafeTcheck Nanto

Page 1: ...Pro Logger II Nanto Operator s Manual...

Page 2: ...liance even if it is not connected in accordance with the standard With a SafeTcheck testing Electrical Safety of Appliances is simple fast accurate thorough and safe You can test the safety of Class...

Page 3: ...liances Option Pro Logger II only 21 RCD Tester 22 High current earth test Option Pro Logger II only 24 Battery Power Standard on Nanto Option on Pro Logger II 25 Utilities Menu F2 key 26 Info display...

Page 4: ...ce with the standard may be found in the OTHER APPLIANCE menu If you experience difficulties or doubts in testing certain appliances please contact TRIO Test Measurement SafeTchecks are designed manuf...

Page 5: ...nance or construction 6 months 12 months 6 months Office environment where equipment is not subject to constant flexing of the supply cord 5 years 5 years 12 months Other commercial environments e g t...

Page 6: ...ion resistance Active Neutral to Cloak 1M Ohm Test duration Approx 3 0 seconds Electrical stress test parameters Insulation 500 250V DC Earth circuit 200mA nominal High Current Earth Test Option avail...

Page 7: ...tal application of 240V 50Hz mains voltage Flush mounted 240V sockets with integrated LEDs to indicate active Test Socket Operating instructions On screen prompts displayed and clearly labeled switche...

Page 8: ...er suitable for the Nanto only Carry Case Accessories for the Nanto only Stainless steel cloak 350 x 600mm Figure 8 Clover Leaf to IEC Mains adaptors Large suitcase style carry cases Scanner and or me...

Page 9: ...on symbol and or by the absence of an earth pin on a moulded socket if not misssing or deliberately removed Note 1 Many double insulated tools are colour coded blue Note 2 If any doubt exists about th...

Page 10: ...st socket Accessory Well Utility Socket 3 Phase Option pro logger ii only Standard 240v test plug Pro logger II only Nanto comes with adaptor cable Standard IEC Test Plug Computer I F USB Port Keyboar...

Page 11: ...s Thumbs Up and PASS indication on LCD and a short BEEP with a GREEN indicator flashing along side Start b Fail Thumbs Down and or LCD Prompt indicating the most probable reason for failure with The m...

Page 12: ...MANUAL 12 Operating Instructions Switch appliance ON and set thermostat or speed control to maximum Cloak Earth Return socket RETURN LEAD AND Clamp Class I II Select Earthed Appliance test Safety test...

Page 13: ...the end of this section The stainless steel cloak may also be woven metal cloth mesh conductive braid aluminium foil or other suitable flexible conductor with low resistance Note The wrapped applianc...

Page 14: ...Up and PASS indication on LCD and a short BEEP with a GREEN indicator flashing along side Start b Fail C Thumbs Down and or LCD Prompt indicating the most probable reason for failure with The measure...

Page 15: ...this must be connected to the fixed test plug on the SafeTcheck with a short TEST extension lead of rated voltage and current which has been previously tested and verified SAFE Normally extension lea...

Page 16: ...ecting one of the following Class 1 Run Test Class 2 Run Test see also Run testing 3 An earth continuity test may be conducted by selecting Earth only test see Safety Testing Earthed Appliances Select...

Page 17: ...increased 5mA threshold because the appliance is Earthed up to 5mA of Leakage Current is permissible The person conducting the test will be warned that the 1mA threshold has been exceeded and that a 5...

Page 18: ...speed controls remote controls etc Run testing Leakage current tests About the SafeTcheck Pro Logger II and Nanto TRIO Test Measurement recommends that the following Run tests are used only if the in...

Page 19: ...ely 7 Press START button and follow the screen instructions The appliance will operate for up to 20 seconds during the run test 8 For Class I appliances requiring a longer than normal run test duratio...

Page 20: ...pliance and make contact with metal parts during the test WARNING The appliance will operate for up to 20 seconds in the run test mode Ensure rotating or heating elements are able to operate safely Ap...

Page 21: ...Pro Logger will indicate a pass Operation This test requires 2 connections to the Pro Logger an earth return connection to the Device Under Test s DUT chassis and a connection the 20 or 32A 3 phase so...

Page 22: ...LCD only This ensures the displayed test result is visible to the user for approximately 2 minutes after the mains power is tripped as a result of testing Figure 1 Figure 2 RCD Tester Overview The Saf...

Page 23: ...il message The SafeTcheck will provide power to the display while the RCD is reset and mains power is returned The SafeTcheck will then prompt you to perform a 180 test by resetting the RCD and then p...

Page 24: ...al purpose setting suitable for all appliances including Electronic and IT The earth resistance threshold is set to 1 2 Routine Test 10A Same test as applied to all electrical appliances during the ma...

Page 25: ...re initially fully charged 1 Power the SafeTcheck from mains power 2 Set the SafeTcheck into Charge mode see below 3 Wait for Charge Complete prompt to appear and then press Start to acknowledge the c...

Page 26: ...Comment See Data Logger Operating Instructions Earth continuity 0 2A When High Current Earth Test option is fitted The Earth Continuity Current maybe set to either 0 2A as a default or as a one off Ro...

Page 27: ...to reduce the chance of an erroneous test result During a Probe Test the feature is disabled This gives the operator the ability to use the probe the cloak or a combination of both to test Double Ins...

Page 28: ...it difficult to use the cloak or To switch between the Double Insulated Probe Test and Options go to the Utilities Menu under the F2 Key Scroll down to the Option using the F2 Key and then select the...

Page 29: ...then the number of records used will be displayed prior to the Start Prompt This information may be displayed at any time by pressing the F1 key while the LCD displays the Start Prompt Additional data...

Page 30: ...e prompt for Tag Number appears at the conclusion of a successful test except in the case of RCD tests For RCD tests the Tag Number is entered prior to the test If the Electrical Test is unsuccessful...

Page 31: ...ss Fail On or Off If set to On the field may not be empty Ask for Tag Turns prompt for the Test Tag Number On or Off If set to On the field may not be empty Ask for Comment Turns prompt for the Commen...

Page 32: ...Fail or Abort dependent on the result for each test IR Insulation Resistance Measured Value M LC Leakage Current Measured Value mA ER Earth Resistance Measured Value EC Electrical Continuity Not impl...

Page 33: ...plications including Microsoft Excel Stored test records should be uploaded to a PC at the end of each testing session or at regular intervals Note The USB cable is supplied together with the Scanner...

Page 34: ...following barcodes from Start to End Setup 1 Places a Enter at the end of each scanned barcode Default Setup 2 Removes the Enter at the end of each scanned barcode Note While the SafeTcheck has been t...

Page 35: ...with Always use a Probe when conducting a live Run Test To switch between the Double Insulated Probe Test and Options go to the Utilities Menu under the F2 Key scroll to the Option using the F1 F2 Key...

Page 36: ...lbourne Sydney Telephone 1300 852 402 Facsimile 1300 853 409 Email sales triotest com au safety triotest com au Visit www triotest com au www SafeTcheck com au SafeTcheck PATs are designed and manufac...

Reviews: