6) Deploy Diaphragms
Orient a Diaphragm so that the front face of the Quad-Beam shape faces toward the Nose of
the system as shown in Figure 23. Slide one Diaphragm all the way to the Backup to ensure
the system is able to collapse properly during impact. Once this has been verified, slide the
Diaphragm forward to approximately 32” [813 mm] in front of the Backup. Orient and slide all
Diaphragms onto Monorail and position each approximately as shown below (Figure 24).
7) Attach End Cap
Attach End Cap to the Monorail as shown in Figure 25 and the Monorail Assembly drawing.
Figure 23
Diaphragm Orientation
32” [813 mm] (Typical)
32” [813 mm] (Typical)
Figure 25
End Cap Attachment
Figure 24
Diaphragm spacing
5/8” HEX NUT (SMALLER)
FRONT
QUAD-BEAM
BACK
TOWARD NOSE
5/8” LOCK WASHER
MONORAIL
END CAP
5/8” x 3 1/2” G5 HEX BOLT
Summary of Contents for QuadGuard Elite M10
Page 1: ......
Page 11: ...TrinityHighway com 10 Revision C September 2021 ME3 Cylinder Assembly 618702...
Page 49: ...TrinityHighway com 48 Revision C September 2021 QuadGuard Elite M10 QGEMTSCVR U Drawings...
Page 50: ...TrinityHighway com 49 Revision C September 2021 TS Concrete Pad 618686...
Page 51: ...TrinityHighway com 50 Revision C September 2021 TS Concrete Pad 8 w Rebar 618686...
Page 52: ...TrinityHighway com 51 Revision C September 2021 TS Concrete Pad 8 wo Rebar 618686...
Page 55: ...TrinityHighway com 54 Revision C September 2021 Thrie Beam Transition QGEMTSCVR TTLR...
Page 56: ...TrinityHighway com 55 Revision C September 2021 End Shoe Transition QGEMTSCVR ESLR...
Page 57: ...TrinityHighway com 56 Revision C September 2021 Extended End Shoe Transition QGEMTSCVR SPE...
Page 58: ...TrinityHighway com 57 Revision C September 2021 31 W Beam Transition QGEMTSCVR TWLR...
Page 59: ...TrinityHighway com 58 Revision C September 2021 Notes...
Page 60: ......