TrinityHighway.com
41
Revision C September 2021
QuadGuard
®
Elite M10 Final Inspection Checklist
Site Location: ___________________________
Date: __________________________________
Inspector: ______________________________
Refer to the QuadGuard
®
Elite M10 Assembly manual and/or drawing package.
If no transition is used, narrow side panels are used with Backup (p. 8)
Proper Transition Panel is used for the type of barrier (pp. 15 - 16)
Minimum clearance of 25” behind rear Fender Panels for movement (p. 18)
Anchor nuts are torqued to 100 ft-lb (p. 20)
Cylinder types are properly placed (p. 23)
Every borehole and slot in Backup and Monorail is utilized (pp. 28 - 29)
Anchor stud(s) height is 1 1/2” [38 mm] or less above the pad (p. 29)
Monorail guides are attached to the Diaphragms (p. 31)
Monorail End Cap Assembly in place (p. 32)
Fender Panel nuts are bottomed out on Mushroom Washer bolt (p. 33)
Mushroom Washers tabs lay flat within Fender Panel slots (pp. 34, 43)
Each Diaphragm and Backup Extension is attached (pp. 35 - 38)
Cylinders are bolted together and tight (pp. 35 - 38)
Bolts and nuts are properly tightened throughout the system (p. 40)
Fender Panel gap is 0.78” or less for Narrow systems (p. 40)
Nose Cylinder is level (p. 48)
System is clear of debris
Summary of Contents for QuadGuard Elite M10
Page 1: ......
Page 11: ...TrinityHighway com 10 Revision C September 2021 ME3 Cylinder Assembly 618702...
Page 49: ...TrinityHighway com 48 Revision C September 2021 QuadGuard Elite M10 QGEMTSCVR U Drawings...
Page 50: ...TrinityHighway com 49 Revision C September 2021 TS Concrete Pad 618686...
Page 51: ...TrinityHighway com 50 Revision C September 2021 TS Concrete Pad 8 w Rebar 618686...
Page 52: ...TrinityHighway com 51 Revision C September 2021 TS Concrete Pad 8 wo Rebar 618686...
Page 55: ...TrinityHighway com 54 Revision C September 2021 Thrie Beam Transition QGEMTSCVR TTLR...
Page 56: ...TrinityHighway com 55 Revision C September 2021 End Shoe Transition QGEMTSCVR ESLR...
Page 57: ...TrinityHighway com 56 Revision C September 2021 Extended End Shoe Transition QGEMTSCVR SPE...
Page 58: ...TrinityHighway com 57 Revision C September 2021 31 W Beam Transition QGEMTSCVR TWLR...
Page 59: ...TrinityHighway com 58 Revision C September 2021 Notes...
Page 60: ......